Laserfiche WebLink
INSPECTION REPORT <br /> Date_5k/fib Permit: Ph/1/U l864--ez) <br /> Contractor: S+ i'L . --LOJ LI LL LC <br /> Owner: g.-21 C ___ _C_ t v i CI(.ts Luc__ <br /> Site Address: S&131 44.2e t4,6r <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> El Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> El Rough In ❑Structural Slab El OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final El Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid El Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Glias Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: F��'JC�I at3z_ <br /> El APPROVAL PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> El OK FOR T.C.O. CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> . 5rn( 6 p ezyr ''`f 5wJ <br /> / c <br /> Inspector: Date: <br /> EIR(10/06) 4ATABAR,INC. <br />