Laserfiche WebLink
. q <br /> 4 s <br /> LEGEND <br /> A <br /> — — — LIMIT OF WORK <br /> � EXISTING ASPHALT PAVEMENT <br /> ," / 1 - I SI NON-VEHICULAR CONCRETE PAVEMENT; <br /> // -,-._ © •EEPROTECTIONANDCSSTRIICTIONLIMITFENCE SEE DETAILS <br /> / `� ff 1 REPAIR SITE DAMAGE; SEE SPECS ON SHEET <br /> SP I\ I L3.01-L3.03 <br /> / \ <br /> / �a 18.55 \ , —TTM ... TREE PROTECTION FENCING; SEE DETAILS <br /> / tib 3'-0" TYP.W'` 3'-0"TYP. \! �`•AVING JOINTS <br /> I - --.--.—JJ—.— <br /> , <br /> w- r CONSTRUCTION JOINT; SEE DETAILS <br /> • \ <br /> JETTY LANDING PARK CONCEPTUAL SECTION A-A'© / ii. .W - •s`is' +.° W'- ,\_-_/ �� 1 / -.\ <br /> EXISTING TREE TO REMAIN <br /> L4.01 • / 0 C.03 ONCRETE PAVEMENT <br /> L4.......5 / a 18.35 W✓per• * S •` � 4 i\ i INNER CRITICAL ROOT ZONE <br /> / 6 p �D/ ; ? �� fi - _ OUTER CRITICAL ROOT ZONE <br /> q. <br /> s,\ ;.18 55•• 6/.• . 18.94 �f/ <br /> • \V O i s\c '� ;;N <br /> g`\• y �/1 �� • "18.94 Jo I DM REMOVE TREE & STUMP (4 TREES) <br /> ,0 s` j ,, A POB AT <br /> 0 •N. . <br /> F �, 6 .� r `9':)/.2,,,,'^ CORNER OF - <br /> I 18.35 ';•• 'X18.74' ^ EX. ASPHALT -14 <br /> i J. c , O/ 1 18,94•A PT o <br /> I G\OS JPO ` r W. �• 90' • PT ,c18.79 .' .. . 6_6". I ao I T I R I TRASH RECEPTACLES; SEE SPEC NOTES <br /> J 18• PT • l/' A <br /> 18.94 .• 18.85 6s- f 18.60 O 16' HIGH SHADE SYSTEM COLUMN; SEE SPEC NOTES <br /> • <br /> — /-- - - '' <br /> LL W G <br /> moo" ` s •• ' -' ` SLOPE TO DRAIN; 6:1 MAX SLOPE, TYP 18.60* *.,*„* 18.08 <br /> ` s 18.74 _- WITH ASPHALT WALKWAY; SLOPE FLUSH • 8 HIGH SHADE SYSTEM COLUMN; SEE SPEC NOTES <br /> T MN• <br /> • - TO DRAIN; SAWCUT ASPHALT AND PATCH <br /> AS NEEDED FOR STRAIGHT EDGE PICNIC TABLE; SEE SPEC NOTES <br /> I% <br /> I 13\0 W� <br /> Y oO y L©.UBGRADE AND SOIL PREP-HYDROSEED I `\ <br /> I �9. . I \ <br /> I <br /> , � -- / TRASH ENCLOSURE; INSTALL PER <br /> a, <br /> ati/ \N.:\ — \ MANUFACTURER'S RECOMMENDATIONS <br /> PRESERVE 8c PROTECT EX CONC _,\ \.. — — — e e I I <br /> PAD , V% /i \ I / / <br /> EXISTING TREES TO REMAIN, 1YP. I IL <br /> I I "8-0" I K1-15, <br /> ---TP __ / / I 1. VERIFY AND CONFIRM ALL DIMENSIONS AND PHYSICAL CONDfTIONS <br /> --- - \ i / SHOWN OR IMPLIED ON THE DRAWINGS AND SPECIFICATIONS. <br /> to./ , /--- �\ NOTIFY THE OWNER'S REPRESENTATIVE OF HORIZONTAL OR VERTICAL <br /> - DISCREPANCIES IMMEDIATELY IN ORDER TO RECEIVE DIRECTION AND <br /> ` �/ `\ _ \,--`\ i \. INSURE THAT CUMULATIVE ERROR DOES NOT OCCUR. <br /> ! I,. ! \ K \ 2. LAYOUT OF ALL PROPOSED ELEMENTS TO BE STAKED IN THE FIELD <br /> 1 - <br /> 9� \-, ,J I � �(��_ /,\_-�''� \ 1 I -- RTO <br /> I <br /> \" / y LAYOUT AND ALIGNMENT OR DIMENSIONING AND <br /> FOR REVIEW AND ACCEPTANCE N <br /> I4 I 9,. \ I / I i' / 1 <br /> INSTALLATION. NOTIFY LANDSCAPE ARCH <br /> FIELD LCONDIITIONS. <br /> m 1i 1. % 3. ALL WORK SHALL BE PLUMB AND SQUARE UNLESS OTHERWISE <br /> 1 . <br /> x <br /> co / > IRE HYDRADO NOT BLOCK - <br /> / <br /> I <br /> Ls, \ �� ��,/ 5. COORDINATE RS, SHEETS L 1LOCATION PRIOR TO PAVEMENT <br /> as / - --;/ I INSTALLATION.R EETISPECLLOTES. <br /> ,,/,,f----TP <br /> *storrAwerx runoff fhvm new <br /> I a` _ I impel-ONO 3arfeces shall <br /> L L / r ,. <br /> N - <br /> J , APPROVED P disperseover YE ehvilvC <br /> N PUBLI WORKS DEPARTMENT y 9 <br /> o / REMOVE TREE & STUMP, TY ,a Sari"tees• <br /> A. BY 1a � L D 5 10 20 <br /> a <br /> 0ini mon <br /> NORTH MARINADATE 4/r/, "")/' SCALE: 1"=10'-O" <br /> CITY OF EVERETT REVIEWED FOR PERMIT IF SHEET IS LESS THAN 22x34 <br /> a REDUCE SCALES ACCORDINGLY <br /> 3 PROJECT ENGINEER: SCALE: DWG, NO. <br /> ' CASCADE .�G E. SCHMIDT 1"=10'-0" PORT OF EVERETT L2.01 <br /> w xa+ N \'� Porto DESIGN DESIGNED BY: DATE: <br /> `�• EvEREnCOLLABORATIVE E. SCHMIDT FEB. 19, 2016 WATERFRONT PLACE CENTRAL C,P ND. <br /> DRAWN C CHECKED 9, <br /> INTERIM PUBLIC ACCESS 6-8-0O1-D2 <br /> o ��\• ,a, J. BARNES L. CORRY PROJECT <br /> LANDSCAPEARCHITECTUREeaWe, DESIGN8101 JETTY LANDING IMPROVEMENTS <br /> P.O. BOX 538 �anno uO. PA-BL-2016-02 <br /> EVERETT, WA 98206 1402 3'"Ave.,Suite 415,Seattle,WA 98101 0 2/19/16 ISSUED FOR BID Sc CONSTRUCTION <br /> APPROVED BY: <br /> 425 259-3164 (206)628-91331D�la1 SITE PLAN 3 I� <br /> NO. DATE BY REVISION NO. DATE BY REVISION G1eNfVE 110.DJ SHEET NO. OF <br />