Laserfiche WebLink
2.2.REVIEW RECORDS OF THE EXISTING 5.2.3.3. RECOMMENDED SYSTEM DYNAMIC OF THIS PARAGRAPH. LOSS-ON-IGNITION ORGANIC MATTER THE LAWN ESTABLISHMENT PERIOD SHALL LEAST 2 WORKING DAYS ADVANCE NOTICE <br /> UNDERGROUND UTILITIES. CALL UTILITY LOCATION (WORKING) PRESSURE (PSI) METHOD. NATIVE SITE TOPSOIL SHALL BE BEGIN UPON ACCEPTANCE BY THE OF DOING SUCH CORRECTIVE WORK. <br /> SERVICE (800) 424-5555 FOR UTILITY LOCATION. 6. RECORD DRAWINGS: SOIL AND SUBGRADE PREPARATION (�2 91 00): AMENDED WITH FINE COMPOST MATERIAL OWNER'S REPRESENTATIVE BASED UPON ACCEPTANCE OF LAWN PLANTING AS <br /> AVOID DAMAGE TO THESE FACILITIES AND SHALL AS DESCRIBED ABOVE, IF MORE ORGANIC BOTH A UNIFORM STAND OF GRASS AND SPECIFIED HEREIN SHALL BE BASED ON A <br /> RESTORE ALL DAMAGED UTILITIES AT 6.1.KEEP A CURRENT SET OF DRAWINGS WITH ALL CONTENT IS NEEDED TO MEET THESE UPON COMPLETION OF A FIRST MOWING. HEALTHY, FULL, VIGOROUSLY GROWING, <br /> AS-BUILT CHANGES OR ACTUAL CONDITIONS AS ORGANIC MATTER REQUIREMENTS. LAWN ESTABLISHMENT SHALL EXTEND FOR AND WELL-MANICURED STAND OF GRASS <br /> CONTRACTOR'S EXPENSE. 1. SUBMITTALS: <br /> WORK PROCEEDS, TO BE SUBMITTED FOR A MINIMUM OF 90 DAYS DURING THE AT THE END OF THE LAWN <br /> 7. CONTRACTOR RESPONSIBLE FOR ACCOMMODATING <br /> 3. SUBMITTALS APPROVAL AT COMPLETION OF IRRIGATION SYSTEM 1.1. PROVIDE SUBMITTALS FOR FINE COMPOST IN ACTIVE GROWING SEASON (DEFINED AS ESTABLISHMENT PERIOD. AREAS THAT <br /> ANY FLUFF FACTOR OR SETTLING. <br /> ACCORDANCE WITH THE REQUIREMENTS OF WSDOT ARE BARE, HAVE A POOR STAND OF <br /> 3.1.SHOP DRAWINGS: SUBMIT SHOP DRAWINGS OF INSTALLATION. THE RED-LINEDBUILT" PLANS SHALL CONSECUTIVE DAYS FROM APRIL 30TH TO <br /> IRRIGATION DESIGN PACKAGE PER NOTE 5 HEREIN CONSIST OF CORRECTIONS, NOTES, STANDARD SPECIFICATIONS FOR ROAD, BRIDGE OCTOBER 30TH). DURING THE LAWN GRASS, ARE DEAD OR DYING, HAVE <br /> PRIOR TO BEGIN OF DEMOLITION AND WITHIN 2 COMMENTS, ETC. ON A CLEAN BOND PAPER AND MUNICIPAL CONSTRUCTION, LATEST EDITION, HYDROSEEDING (32 92 00): WEEDS, OR HAVE A SPOTTY OR <br /> 8 <br /> SECTION 9.14.4 . ESTABLISHMENT PERIOD, THE CONTRACTOR NON-UNIFORM GRADE THROUGH ANY <br /> WEEKS FROM NOTICE TO PROCEED TO ENGINEER COPY. SHOW ALL CRITICAL DIMENSIONS. ( ) SHALL ENSURE THE CONTINUING HEALTHY CAUSE SHALL BE REMEDIED BY <br /> FOR REVIEW AND APPROVAL. 1.2. PROVIDE SOIL SUBMITTALS OF A CERTIFIED GROWTH OF THE LAWN. <br /> 7. MAINTENANCE AND OPERATIONS (M&0) MANUAL 1. SUBMITTALS: REGRADING, REMOVING AND RESEEDING <br /> 3.2.POINT OF CONNECTION PRESSURE TEST: TEST 7.1.PREPARE A COMPLETE MAINTENANCE AND LABORATORY ANALYSIS FROM AN ACCREDITED 8:10.3. ADEQUATE AND PROPER CARE SHALL <br /> WATER PRESSURE AT EXISTING POINT OF OPERATIONSMANUAL AND SUBMIT THREE SOILS TESTING LABORATORY INDICATING THE 1.1.PROVIDE PRODUCT DATA ON SPECIFIED SEED MIX. OR RESODDING, REFERTILIZING, REMOWING, <br /> CONNECTION FOR HYDRAULIC CALCULATIONS. (M&O) MATERIAL SOURCE AND COMPLIANCE WITH ALL 2. HYDROSEEDING SHALL BE INSTALLED PER WSDOT INCLUDE THE LABOR, MATERIALS, AND AND REWATERING, AS APPROPRIATE. <br /> EQUIPMENT NECESSARY TO KEEP <br /> COPIES AT FINAL INSPECTION. THE MANUALS <br /> SPECIFICATIONS FOR APPROVAL PRIOR TO STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND5.10.3.6.APPROXIMATELY 10 DAYS BEFORE THE <br /> INSTALLED LAWN IN A.PRESENTABLE <br /> 3.3.PRODUCT DATA SUBMIT PRODUCT DATA 2 WEEKS CONSIST OF THREE RING BINDERS CONTAINING: DELIVERY TO THE PROJECT SITE. SAMPLE SIZE MUNICIPAL CONSTRUCTION, LATEST EDITION, END OF THE LAWN ESTABLISHMENT <br /> PRIOR TO START OF IRRIGATION WORK. INCLUDECONDf110N INCLUDING, BUT NOT LIMITED PERIOD, THE CONTRACTOR SHALL <br /> (1) CATALOGS OF ALL MATERIALS USED, (2) A SHALL BE A MINIMUM OF 2 POUNDS. SECTION 8-02 TO, WATERING, MOWING, TRIMMING, <br /> MANUFACTURER'S PRODUCT LITERATURE FOR ALL COMPLETE PARTS LIST OF ALL MATERIALS, (3) A REQUEST A FINAL INSPECTION FOR <br /> 1.3. 3. SEED FOR LAWNS SHALL BE AS FOLLOWS: CUTTING WITH AN ACCEPTABLE MULCH <br /> PRODUCTS TO BE INSTALLED ON THIS SYSTEM. ACCEPTANCE OF THE ESTABLISHED LAWN. <br /> WRITTEN SUMMARY OF ALL OPERATIONS DATA 2. COMPLETE SOIL AND SUBGRADE PREPARATION PER 3.1.SUNMARK LAWN BLOOMERS MIX AS SUPPLIED BY MOWER, LITTER AND'DEBRIS REMOVAL, CONDITIONS FOUND UNACCEPTABLE BY <br /> 3.4.RECORD DOCUMENTS: RECORD AND SUBMIT INCLUDING SPRING START-UP AND WINTERIZATION <br /> 'AS-BUILT' INFORMATION ON IRRIGATION SYSTEM. TECHNIQUES, CONTROLLER PROGRAMMING, VALVE CONTRACT DOCUMENTS. SUNMARK SEEDS INTERNATIONAL, INC. EDGING,.FERTILIZATION;WEED CONTROL, <br /> REPAIR AND RESEEDING DAMAGED AREAS, THE OWNER'S REPRESENTATIVE SHALL BE <br /> 3.5.MAINTENANCE AND OPERATIONS (M&O) MANUAL CLEANING, IRRIGATION ADJUSTMENTS, BACKFLOW 3. ALL PLANTING AREAS INCLUDING HYDROSEEDED 888-214-7333, OR APPROVED EQUAL. AND REPAIRING AND KEEPING IN CORRECTED BY THE CONTRACTOR WITHIN <br /> 4. SYSTEM REQUIREMENTS INFORMATION <br /> OPERATION AND ANY OTHER LAWNS AND REPAIR AREAS, SHALL RECEIVE 2.5" 3.2.INSTALL AT A RATE OF 1 LB PER 1000 SF. OPERATION IRRIGATION SYSTEMS INSTALLED 5 WORKING DAYS OF SUCH NOTICE. <br /> INFORMATION REQUIRED TO OPERATE AND COMPOST PER WSDOT SECTION 8-02, RIPPED AND 4. SEEDING, FERTILIZING AND MULCHING SHALL BE AS PART OF THE WORK. AS A PART OF WHEN SUCH CORRECTION IS REQUIRED, <br /> 4.1.DESIGN SYSTEM TO TARGET EACH PLANTING AREA MAINTAIN SYSTEM, AND TWO LOCAL DISTRIBUTORS. MIXED TO A DEPTH OF AT LEAST 8". PERFORMED DURING THE ALLOWABLE TIME FRAMES LAWN ESTABLISHMENT, THE CONTRACTOR THE LAWN ESTABLISHMENT PERIOD SHALL <br /> WITH NO OVERSPRAY ON IMPERVIOUS SURFACES 8. FIELD TESTING 4. SEE DETAILS FOR PLANTING SOIL DEPTHS. APRIL 1 TO MAY 31 OR SEPTEMBER 1 TO SHALL EXTEND AN ADDITIONAL 45 DAYS. <br /> OR ADJACENT PLANTING AREAS. AVOID RUNOFFOCTOBER 15. WRITTEN PERMISSION FROM THE <br /> OF WATER FROM THE SITE. 8.1.REQUEST OWNER'S REP ATTENDANCE AT EACH 5. ALL AREAS IMPACTED BY CONSTRUCTION ACTIVITY OWNER'S REPRESENTATIVE REQUIRED FOR SEEDING 5.10.3.1.SUBPAR-1AL: THE CONTRACTOR SHALL <br /> TEST. GIVE A MINIMUM OF ONE-WEEK PRIOR OF ANY KIND, INCLUDING STORAGE OF MATERIALS, OUTSIDETHE SEEDING SEASON. SUBMIT AT LEAST 5 WORKING DAYS IN <br /> 4.2.DO NOT EXCEED MANUFACTURER'S SPRINKLER <br /> NOTICE. SHALL RECEIVE FULL REPAIR TO ORIGINALA . ADVANCE, THE PROPOSED WATERING AND <br /> SPACING REQUIREMENTS. 8.2.MAINLINE PRESSURE TESTING: CONDITIONS. 5. HYDROSEEDED AREA INSTALLATION SHALL PROCEED MOWING SCHEDULES TO THE OWNER'S <br /> 4.3.DESIGN SYSTEM SO THAT SPRINKLERS OPERATEg,2.1. LEAVE ALL SYSTEM JOINTS, CONNECTIONS, 6. SOIL FOR HYDROSEEDED AREAS: THROUGH THE FOLLOWING SEQUENCE OF STEPS IN REPRESENTATIVE. THE SUBMITTAL SHALL <br /> WITFIIN MANUFACTURER-RECOMMENDED OPERATING ETC. EXPOSED UNTIL AFTER COMPLETION 6.1.SOIL SHALL CONSIST OF 75% SAND OR LOAMY ITS CONSTRUCTION AND SHALL BE COORDINATED ALSO IDENTIFY THE TYPE OF MOWER <br /> PRESSURE. WITH IRRIGATION SYSTEM CONSTRUCTION WHEN EQUIPMENT TO BE USED. <br /> AND ACCEPTANCE OF THE PRESSURE SAND AND 25% FINE COMPOST BY VOLUME. APPLICABLE: <br /> 4.4.PRODUCTS: MATCH EXISTING PRODUCT FOR TEST. 6.2.SAND USED SHALL MEET THE FOLLOWING: 5.10.3.2.MOW AND EDGE TO LIMIT THE HEIGHT OF <br /> IRRIGATION SYSTEM. ENSURE ALL NOZZLES ARE 5.1.PERFORM SUBGRADE PREPARATION AND INSTALL LAWN TO 3 INCHES. THE CUTTING HEIGHT <br /> MATCHED PRECIPITATION RATE (+/-5%) WITHIN A 8.2.2• MAINLINE SHALL BE SUBJECTED TO 6.2.1. SCREEN SIZE PERCENT PASSING SOIL AS REQUIRED IN SECTION 32 91 00 AND SHALL BE 3 INCHES WITH ALL CUTTINGS <br /> STATIC PRESSURE TEST OF 150 PSI. TO <br /> ZONE. 3/8 100 CONTRACT DOCUMENT DETAILS INCLUDING THE RETAINED USING MULCHING MOWER <br /> BE VALID ALL TESTS MUST BE ADDITION OF ANY AMENDMENT AND APPLICATION EQUIPMENT. SLOPES EXCEEDING 4:1 <br /> 4.5.SELECT MAIN AND LATERAL PIPE SIZES SO THAT PERFORMED UNDER THE DIRECTION AND #20 77 - 100 OF LIME REQUIRED. SHALL NOT BE MOWN. <br /> THE VELOCITY OF WATER MOVING THROUGH THE SUPERVISION OF OWNER'S REP. <br /> IRRIGATION PIPE DOES NOT EXCEED STATE AND #60 0 - 23 5.2.RAKE TO REMOVE AND DISPOSE OF ALL LARGE 5.10.3.3.A TURF FERTILIZER WITH ORGANIC <br /> LOCAL REQUIREMENTS, OR THE INDUSTRY 8.2.3. ATTACH TEST COMPRESSOR WITH #200 0 - 10 CLODS, ROCKS, DEBRIS AND UTTER LARGER THAN FERTILIZER, OR A SLOW-RELEASE FORM <br /> STANDARD OF 5 FPS, WHICHEVER IS LOWER. PRESSURE GAUGE TO HEAD OF MAINLINE. 1 INCH IN ANY DIMENSION. OF NITROGEN SHALL BE APPLIED AT THE <br /> 8.2.4. ATTACH GATE VALVE TO OPPOSITE END OF 6.2.2. SAND SHALL HAVE A PH RANGE OF 5.0 <br /> 5. IRRIGATION DESIGN PACKAGE - 6.5. SOILS INDICATED HAVING A PH 5.3.ROLL THE AREA IN 2 DIRECTIONS, THE SECOND END OF THE LAWN ESTABLISHMENT <br /> 5.1.THE GRAPHIC PRESENTATION OF THE MAINLINE. BELOW 5.0 SHALL BE TREATED WITH ROLLING AT RIGHT ANGLES TO THE FIRST. THE PERIOD AT THE RATE OF APPLICATION <br /> ) DIAGRAMMATIC DESIGN SHALL INCLUDE CLEAR AND 8.2.5. OPEN GATE VALVE AND INSTALL DOLOMITIC LIMESTONE AS NECESSARY TO ROLLER SHALL BE OF A STANDARD, WATERFILLED AND FORMULATION RECOMMENDED BY <br /> CONCISE REPRODUCIBLE DRAWINGS WITH ALL PRESSURE GAUGE, THEN REOPEN VALVE. ATTAIN THIS PH RANGE. SOILS HAVING A TYPE TO APPLY 150 TO 300 LBS PER SQUARE SOIL TESTING AGENCY. FOLLOWING <br /> COMPONENTS SIZED, SYMBOLIZED AND KEYED IN 8.2.6. APPLY 150 PSI TO MAINLINE, TEST IS PH GREATER THAN 6.5 SHALL BE FOOT GROUND PRESSURE. FERTILIZER APPLICATION, THE LAWN SHALL <br /> A DISTINCTIVE MANNER. DRAWINGS ARE TO BE AT FOR ONE HOUR. MAXIMUM ALLOWABLE TREATED WITH SULFUR AS NECESSARY TO 5.4.THE FINISHED GRADE SHALL MEET THE VERTICAL BE THOROUGHLY WATERED WITH AT LEAST <br /> A SUITABLE SCALE TO BE CLEAR AND LEGIBLE, DROP IS 5 PSI IN ONE HOURS ATTAIN THIS PH RANGE. THE PH SHALL CLEARANCE REQUIREMENTS ADJACENT TO A 1 INCH DEPTH OF WATER. <br /> AND HAVE A NORTH ARROW AND SCALE BAR. 9. PERFORMANCE TEST BE DETERMINED BY SOIL TEST. IMPROVEMENTS AS SPECIFIED IN THE CONTRACT 5.10.3.4.WATERING SHALL BE ACCOMPLISHED EACH <br /> CONTRACTOR SHALL AMEND AND FERTILIZE PLANS AND DETAILS. WEEK FROM MARCH THROUGH SEPTEMBER. <br /> 5.2.PROVIDE A COMPLETE IRRIGATION DESIGN 9.1.REQUEST OWNER'S REP ATTENDANCE AT THE SOIL PER SOIL TESTING LABORATORY WHEN WATER APPLICATION IS BY <br /> PACKAGE, TO INCLUDE THE FOLLOWING: RECOMMENDATIONS. 5.5.FERTILIZER SHALL BE APPLIED AS REQUIRED IN <br /> SYSTEM COVERAGE TEST. GIVE A MINIMUM OF AUTOMATIC IRRIGATION SYSTEM, THEN <br /> 5.2.1. SITE SPECIFIC INFORMATION: ONE-WEEK PRIOR NOTICE. SECTION 32 91 00. COVERAGE SHALL BE WATERING SHALL BE DONE BETWEEN THE <br /> 6.2.3. ORGANIC MATTER SHALL CONSIST OF FINE FAIRLY UNIFORM AND ALL AREAS SHALL BE HOURS OF 2:00 AM AND 5:00 AM. AT A <br /> 5.2.1.1. SITE MAP, THAT INCLUDES NORTH 9.2.SYSTEM PERFORMANCE DEMONSTRATION: COMPOST AS DESCRIBED ABOVE. COVERED. CONTRACTOR OPTION TO COMBINE <br /> SYMBOL, TOPOGRAPHY, BUILDING AND KEY 9.2.1, UPON COMPLETION OF THE SYSTEMWITH HYDROSEEDING. MINIMUM, A UNIFORM APPLICATION OF 1 <br /> ELEVATIONS 6.2.4. SOIL SHALL NOT CONTAIN ANY VIABLE INCH OF WATER SHALL BE REQUIRED <br /> INSTALLATION, INCLUDING PUMP AND SEEDS OR ROOTS CAPABLE OF 5.6.APPLY THE SEED MIX BY HYDROSEEDING. OVER ALL LAWN AREAS EACH WEEK <br /> 5.2.1.2. STATIC PRESSURE (PSI) AT POINT OF CONTROLLER INSTALLATION AND HOOK-UP, SPROUTING OF ANY STATE-LISTED 5.7.WATER THE AREA AS REQUIRED TO ESTABLISH. UNLESS RAINFALL PROVIDES MINIMUM <br /> CONNECTION, FROM PRESSURE TEST AND AFTER THE FLUSHING AND PRESSURE NOXIOUS WEED OR INVASIVE AMOUNT. THE CONTRACTOR SHALL BE <br /> TESTS ARE COMPLETED, PERFORM A 5.8.INSTALL TEMPORARY FLAGGING AND WARNING <br /> 5.2.1.3. REFERENCE TO LOCATION INFORMATION ROOT-PROPAGATING PLANTS INCLUDING PREPARED TO WATER MORE FREQUENTLY <br /> SYSTEM COVERAGE TEST FOR EACH ZONE BUT NOT LIMITED TO HORSETAIL IVY, SIGNS TO PREVENT THE PUBLIC FROM SHOULD VERY DRY CONDITIONS PERSIST. <br /> a UTILRIESNG LOCATION OF SUBSURFACE DISTURBING AND DAMAGING NEWLY INSTALLED <br /> IN THE PRESENCE OF THE OWNER'S REP CLEMATIS, KNOTWEED, ETC. SOIL FOUND <br /> AND OWNER'S MAINTENANCE PERSONNEL TO CONTAIN THESE PROHIBITED VIABLE HYDROSEEDED AREAS. 5.10.3.5.LAWN AREAS WILL BE INSPECTED BY THE <br /> M 5.2.2. IDENTIFICATION AND LOCATION OF OWNER'S REPRESENTATIVE DURING THE <br /> a PLANT MATERIALS SHALL BE REMOVED 5.9.THE HYDROSEEDING ESTABLISHMENT PERIOD <br /> N IRRIGATION COMPONENTS. INCLUDING 9.2.2. REPAIR ANY CLOGGED OR DAMAGED LAWN ESTABLISHMENT PERIOD. SHOULD <br /> MANUFACTURER, MODEL TYPE AND SIZE. NOZZLES. CORRECT ALL DEFICIENCIES, AND REPLACED AT THE CONTRACTOR'S SHALL FOLLOW THE OWNER'S REPRESENTATIVE'S THE OWNER'S REPRESENTATIVE DETERMINE <br /> WITHOUT ADDITIONAL COST, UNTIL THE EXPENSE. ACCEPTANCE OF THE NEWLY INSTALLED AT ANY TIME THAT THE CONTRACTORETMI <br /> oS 5.2.2.1. EXISTING IRRIGATION SYSTEM COMPONENTS HYDROSEEDING AREAS. UPON ACCEPTANCE ALLAPPROVED <br /> OWNER'S REP APPROVES THE SYSTEM. 6.3.ALTERNATIVE SOIL FOR HYDROSEEDING: <br /> TO REMAIN. IS <br /> TEMPORARY FLAGGING AND WARNING SIGNS SHALL NOT PROVIDING ADEQUATE AND PROPER <br /> CAI 9.2.3. SYSTEM SHALL BE TESTED FOR BOTH STOCKPILED SOIL PREPARED TO MEET THE CARE OF THE LAWN OR IS PERFORMING <br /> 0 5.2.2.2. SLEEVING UNDER NEW PAVEMENT FOLLOWING REQUIRMENTS: BE REMOVED. UNACCEPTABLE LAWN ESTABLISHMENT PUBLI I,sIRKS DEP` -TM T <br /> \ MANUAL AND FULLY AUTOMATIC <br /> O 5.2.2.3. STATION ZONE VALVES 5.10. THE HYDROSEEDING ESTABLISHMENT PERIOD <br /> / OPERATION. 6.3.1. THE FINAL TOPSOIL SHALL HAVE AN SHALL BE FOR ONE YEAR. WORK, THE OWNER'S REPRESENTATIVE J <br /> N 5.2.2.4. HEAD LAYOUT 9.3.MAINTENANCE TRAINING: UPON ACCEPTANCE OF ORGANIC MATTER CONTENT BY DRY WILL PROVIDE WRITTEN NOTICE TO THE JI , E / <br /> 5.2.3. BASIC HYDRAULICS (PRESSURE LOSS THE SYSTEM BY THE OWNER'S REPRESENTATIVE, WEIGHT OF 5% FOR AREAS WHERE 5.10.1. LAWN ESTABLISHMENT WORK SHALL BE CONTRACTOR TO CORRECT AND REMEDY BY <br /> rn CALCULATIONS) FOR EACH ZONE. FURNISH TO THE OWNER'S PERSONNEL KEYS AND HYDROSEED WILL BE INSTALLED. ORGANIC PERFORMED BY PERSONNEL QUALIFIED IN . SUCH UNACCEPTABLE WORK OR PRACTICE. �/� <br /> v MATTER SHALL BE DETERMINED BY AND EXPERIENCED WITH, SUSTAINABLE THE CONTRACTOR SHALL MAKE THE DATE /2-ZO <br /> OTHER TOOLS NECESSARY TO OPERATE, AND NECESSARY CORRECTIONS WITHIN 5 <br /> � 5.2.3.1. STATE WATER PRESSURE (PSI) AT POINT LOSS-ON-IGNITION TEST. ACCEPTABLE TURF MANAGEMENT PRACTICES. CITY OF EVERETT REVIEWED FOR PERMIT <br /> n MAINTAIN THE SYSTEM. FURNISH SUFFICIENT TESTS INCLUDE THE MOST CURRENT <br /> y OF CONNECTION TRAINING TO THE OWNER'S PERSONNEL IN THE 5.10.2. LAWN ESTABLISHMENT SHALL CONSIST OF WORKING DAYS OF THE DATE OF THE <br /> I VERSION OF ASTM 02974 TEST METHODS PROVIDING ADEQUATE AND PROPER CARE WRITTEN NOTICE AND SHALL PROVIDE AT <br /> 5.2.3.2. PRESSURE LOSS THROUGH ALL SYSTEM OPERATION MAINTENANCE, AND WINTERIZATION OF FOR MOISTURE, ASH, AND ORGANIC FOR ALL HYDROSEEDED AREAS INSTALLED <br /> COMPONENTS LISTED ABOVE, INCLUDING THE SYSTEM. THE CONTRACTOR SHALL BE WITHIN THE LIMITS OF THE PROJECT. <br /> o- POINT OF CONNECTION, EXISTING MAINLINE LIABLE FOR ALL DAMAGES OR LOSSES RESULTING MATTER OF PEAT AND OTHER ORGANIC IF SHEET IS LESS THAN 22x34 <br /> AND LATERAL LINE PIPING FROM FAILURE TO COMPLY WITH THE PROVISIONS SOILS, AND TMECC 05.07A REDUCE SCALES ACCORDINGLY <br /> n <br /> 3 - - PROJECT ENGINEER: SCALE: DWG. NO. <br /> CASCADE PORT OF EVERETT X3.03 <br /> dip E. SCHMIDT NO SCALE <br /> Porto DESIGN �G` DESIE GNED BY FEB. 19, 2016 WATERFRONT PLACE CENTRAL CIP NO. <br /> COLLABORATIVE DRAWN BY: CHECKED BY: 6-8-001-02 <br /> 3 -`4. uwoscnrEe�lairrEcrultE+uaenrlo�vvr,►1 F, D. ROBBEN J. KLEINKOPF INTERIM PUBLIC ACCESS No. PA-BL-2016-02 <br /> ,� P.O. BOX 538 <br /> JETTY LANDING IMPROVEMENTS PROJECT <br /> n. EVERETT, WA 98206 1402 3'�Ave.,Suite 415,Seattle,WA 98101 Q 2/19/16 ISSUED FOR BID & CONSTRUCTION APPROVED BY: <br /> (425) 259-3164 R�+)�&91331 eafeadadesipncolleb eom -'-,f <br /> N0. DATE BY REVISION N0. DATE BY REVISION ` SPECIFICATION N 0 T E S SHEET NO. 7 OF J'� I I <br /> 3 <br />