Laserfiche WebLink
6/5/2019 /::1,) <br /> City of Everett Page 1 <br /> 11:32:22AM <br /> INSPECTION ACTIVITY REPORT --` <br /> Permit No. C1809-003 Site Address 2321 ADAMS AVE <br /> Applied 9/6/2018 Applicant PAVEL A Lot <br /> Approved 1/18/2019 Owner A&P HOLDINGS LLC Block <br /> Issued 1/18/2019 Contractor A&P HOLDINGS LLC Tract <br /> Parent Permit No. PW 1811-056 Description NEW SINGLE FAMILY RESIDENCE <br /> Notes (11/29/2018 10:14 AM TRN) <br /> PERMIT CONDITIONS: 1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 1/30/2019 1/30/2019 BLDG KMK APPROVAL eTRAKiT Inspection 1/29/2019 11:43 AM A&P HOLDINGS <br /> 02-FOOTING/SETB Request LLC <br /> late morning please 4255082465 <br /> Contact Name:A&P HOLDINGS LLC <br /> Site Address:PO Box 1395 <br /> Phone:4255082465 <br /> e-Mail:pavelgpa@gmail.com <br /> 1/30/2019 1/30/2019 BLDG KMK APPROVAL eTRAKiT Inspection 1/29/2019 11:43 AMA&P HOLDINGS <br /> 03-FOUNDATION Request LLC <br /> late morning please 4255082465 <br /> Contact Name:A&P HOLDINGS LLC <br /> Site Address:PO Box 1395 <br /> Phone:4255082465 <br /> e-Mail:pavelgpa@gmail.com <br /> 1/30/2019 1/30/2019 BLDG 04-UFER KMK APPROVAL eTRAKiT Inspection 1/29/2019 11:43 AM A&P HOLDINGS <br /> GROUND Request LLC <br /> late morning please 4255082465 <br /> Contact Name:A&P HOLDINGS LLC <br /> Site Address:PO Box 1395 <br /> Phone:4255082465 <br /> e-Mail:pavelgpa@gmail.com <br /> 2/15/2019 2/15/2019 BLDG DWF APPROVAL as noted AM inspection requested <br /> 05-UNDERFLOOR Phone:425-508-2465 <br /> (2/15/2019 9:24 AM DWF) <br /> Contractor to install 3x plate at interior <br /> garage wall as per plans,then ok to cover. <br /> 2/27/2019 2/27/2019 BLDG DWF PARTIAL APPI2 eTRAKiT Inspection 2/26/2019 10:06 PM <br /> 07-EXTERIOR Request pm please <br /> Contact Name:Pavel Andreyanov <br /> Site Address:PO Box 1395 <br /> Phone:4255082465 <br /> e-Mail:pavelgpa@gmail.com <br /> (2/27/2019 10:20 AM DWF) <br /> Exterior shear nailing ok,subject to <br /> installing LTP4's as per plans,then ok to <br /> cover(siding). <br /> Note:owner/contractor to install a <br /> temporary site address to continue <br /> inspections. <br /> 3/8/2019 3/8/2019 GAS 01-ROUGH IN SDP APPROVAL PM inspection requested <br /> Phone:425-508-2465 <br /> (3/8/2019 3:00 PM SDP) <br /> Pressure test 15#. 1"service to stove,bbq <br /> and fireplace. <br /> 3/8/2019 3/8/2019 MECH 04-ROUGH SDP NOT READY PM inspection requested <br /> IN Phone:425-508-2465 <br /> (3/8/2019 3:00 PM SDP) <br /> Complete exhaust fans <br /> INSP12 CRWSYS/this <br />