My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
127 BARBARA LN 2020-05-06
>
Address Records
>
BARBARA LN
>
127
>
127 BARBARA LN 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 3:18:46 PM
Creation date
5/6/2020 3:18:33 PM
Metadata
Fields
Template:
Address Document
Street Name
BARBARA LN
Street Number
127
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL■■V1/ORKS PERMIT I II Date Applied: 5/22/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1905-069 <br /> E V E R E T T 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $2333.12 <br /> 2OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRES �""� Cts19 <br /> ROUMELIOTIS KARY ROUMELIOTIS KARY <br /> 4420 75TH ST SW 4420 75TH ST SW <br /> MUKILTEO,WA,98275 MUKILTEO,WA,98275 <br /> PHONE:4257727485 PHONE:4257727485 <br /> TAX PARCEL ID#:00598700002003 SITE ADDRESS: 127 BARBARA LN <br /> DESCRIPTION: NEW PAVED DRIVEWAY PAD <br /> 676SF <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 5/22/2019. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to <br /> formally request all required inspections. Flyers are provided at permit issuance with instructions on how to-equesn <br /> inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the c :ree i xi f the PW Inspector. <br /> Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surftice will <br /> be managed on-site in a manner that does not adversely affect neighboring properties, includiA the City's right-of-yb. y <br /> and/or easements and the improvements located therein. I d <br /> 10.This permit must be finaled in order to close out this permit. Request a final inspection cdtl i =,by.seAecting PW 22-Site <br /> • <br /> Final within the Online Permitting Portal Inspection Requests for this permit when all items h'aire b=ee i acbmpleted. ?" <br /> Public Works Permit Fee Breakdown: <br /> Paving (676SF) $45.00 <br /> PW Site Inspection $20.00 <br /> Stormwater System Development Fee(676sf) $168.12 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save harmless <br /> the City of Everett from any and all claims for damages,costs,expenses,or <br /> �,. O causes of action that may arise because of installation and maintenance of <br /> Approved for Construction(Public Works) Date / the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> S-z7 -/ <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> eL6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.