Laserfiche WebLink
• <br /> r <br /> 1110.6-�ij,,.��1 FIELD <br /> ill &A s s o c i a t e s, I n c. REPORT NO.: 15347DFR121815-DK <br /> Geotechnical Engineering•Environmental Engineering <br /> Construction Testing and Inspection <br /> DATE: 12/18/2015 CONTRACTOR: <br /> PROJECT#: 09615347 PERMIT#: <br /> PROJECT: Jimmy Johns INSPECTOR: Don Keller <br /> LOCATION: 2602 Broadway Ave JURISDICTION: Everett <br /> KA P.M.: WEATHER: TEMP: <br /> Performed reinspection of shearwall framing @A& 1-1.8,@B&1-2.End of studs are now firmly and squarely seated <br /> in top and bottom tracks as per GSN,S1. S2 7/13/15. <br /> Reviewed By: '(a--.1. .. ASTM Test#: Equipment/Asset Number(s): <br /> To the best of my knowledge,the above WAS performed in accordance with the approved plans,specifications and regulatory requirements. <br /> Superintendent/Representative: Technician: <br /> Offices Serving the Western United States <br /> Lynnwood(425)485-5519•Poulsbo(360)598-2126•Puyallup(253)939-2500 <br /> Daily Field Report Revision 8 <br /> Effective 02/13/2013 <br /> The information pmvidadonthisroponbpreparedfrtheexclusiveuseofthectimt.n;sreportmaynonxreproducedinanynrmalwithomwewastmpermisaionormeclientandKisses&Associate„This mon mdi.tes our inspectors observation and testing mulls baved on site conditions and contractor <br /> activities.This imunaalion iv subjmt to mien prior to final snbminal.By signing this tenon.our invpmor does not accept responsibility for validity of results.The aamn inhumation has been provided by others on site. <br />