Laserfiche WebLink
7/10/2019 Page 1 <br /> City of Everett <br /> 8:53:44AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1503-020 Site Address 2602 BROADWAY <br /> Applied 3/11/2015 Applicant Lot <br /> Approved 8/11/2015 Owner SHAW MELVIN&MARY Block <br /> Issued 8/31/2015 Contractor ALEGIS CONSTRUCTION INC Tract <br /> Parent Permit No. D1503-002 Description NEW BUILDING-JIMMY JOHN'S <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/8/2015 10/8/2015 Foundation KMK Corr Reqd Consultation Work 1)Provide approved drawings at next <br /> in progress,see notes inspection. <br /> 2)Provide special inspection report and <br /> final letter for rebar epoxy dowels. <br /> 10/9/2015 10/9/2015 Foundation KMK PartialApproval See notes Please provide Special Inspection reports <br /> for: <br /> -concrete pour <br /> -rebar <br /> -epoxy dowels <br /> -welding etc <br /> 10/13/2015 10/13/2015 Foundation KMK Approval See notes Please provide final letters from Speical <br /> Inspection agencies. <br /> 10/13/2015 10/13/2015 UFER Ground KMK Approval <br /> 10/28/2015 10/28/2015 Framing KMK PartialApproval See notes 1)Cornice framing OK to cover. <br /> 2)Perimeter 2"(R-10 is under slab with <br /> insulation in place)-underslab insulation <br /> OK. <br /> 12/3/2015 12/3/2015 Foundation KMK PartialApproval Trash enclosure OK <br /> to pour <br /> 1/8/2016 1/8/2016 Framing KMK Approval See notes Framing OK. OK to cover when all <br /> inspections completed. <br /> Note:Leave areas open for Plumbing and <br /> Mechanical inspections. <br /> 1/8/2016 1/8/2016 InsulBldg KMK Approval <br /> 1/12/2016 1/12/2016 ShearNailing KMK Approval Speical Inspection, See Special Inspection report by Krazan <br /> see notes 1/218. <br /> #15347DFR121815-DK <br /> 1/13/2016 1/13/2016 DrywallNailing DWF Approval OK to cover <br /> (mud/tape) <br /> 2/12/2016 12/13/2018 Bldg Other DWF Unable to inspect, <br /> address incorrect <br /> 2/19/2016 12/13/2018 Consultation DWF Stairway, <br /> handrailing. <br /> 3/21/2016 3/21/2016 Final Bldg KMK Approval <br /> 3/21/2016 3/21/2016 Mark Final** KMK Approval <br /> 4/5/2016 4/6/2016 Final Fire JJV Approval finalled by fire dept. <br /> 4/5/2016 4/5/2016 FINAL PLANNING BEP Con Reqd Zoning requirements Landscaping and BMU Design <br /> not met Requirements not met per approved plans. <br /> Applicant/Owner fully aware of <br /> noncompliance preventing a Planning <br /> Inspection approval. <br /> 4/5/2016 4/5/2016 TCO Issued TRL Approval Planning approval Planning/land Use requirements must be <br /> prior to final CO satisfied prior to issuance of full C of 0 <br /> 9/11/2017 Letter KLH Expired permit& <br /> TCO,14 day grace <br /> 9/18/2017 9/18/2017 TCO Issued TRL <br /> 10/11/2017 10/11/2017 Permit Extension GEP Approval Permit Extension til <br /> 4/9/18 <br /> INSP12 Calfirs <br /> '9''STlwr <br />