My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 COLBY AVE 2020-05-07
>
Address Records
>
COLBY AVE
>
1923
>
1923 COLBY AVE 2020-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 2:43:05 PM
Creation date
5/7/2020 2:42:24 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/2019 Page 1 <br /> City of Everett <br /> 9:23:52AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1807-005 Site Address 1923 COLBY AVE <br /> Applied 7/16/2018 Applicant WIDEN CALEB Lot <br /> Approved 10/10/2018 Owner HUDSON RYAN E&KIRSTEN A Block <br /> Issued 10/11/2018 Contractor WIDEN CONSTRUCTION LLC Tract <br /> Parent Permit No. PW 1810-008 Description NEW CONSTRUCTION OF A DUPLEX <br /> Notes (10/2/2018 2:35 PM TRN) <br /> PERMIT CONDITIONS:1.Downspouts shall discharge to splash blocks.2.Erosion control measures <br /> shall be installed.3.No dirt,etc.to be tracked onto roadway. <br /> (10/10/2018 9:27 AM TAH) <br /> LANDSCAPE FINAL REQUIRED <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 10/12/2018 10/12/2018 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 10/12/2018 10/12/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 10/12/2018 10/12/2018 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 10/22/2018 10/22/2018 BLDG KMK APPROVAL <br /> 05-UNDERFLOOR <br /> 11/19/2018 11/19/2018 BLDG DWF APPROVAL OK to cover <br /> 07-EXTERIOR <br /> 11/30/2018 11/30/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 12/12/2018 12/12/2018 MECH 04-ROUGH SDP APPROVAL <br /> IN <br /> 12/12/2018 12/12/2018 BLDG KMK OTHER Cancelled <br /> 08-FRAMING <br /> 12/12/2018 12/12/2018 BLDG KMK OTHER (12/12/2018 3:13 PM KMK) <br /> 08-FRAMING Cancelled <br /> 12/13/2018 12/13/2018 BLDG DWF APPROVAL see notes need to complete install of LSSU210 and <br /> 08-FRAMING strap cut outs. <br /> Strap stair stringers with A-35 brackets. <br /> 12/17/2018 12/18/2018 BLDG DWF APPROVAL also approved <br /> 11-INSULATION framing. <br /> 12/18/2018 12/18/2018 BLDG DWF APPROVAL <br /> 08-FRAMING <br /> 12/18/2018 12/18/2018 BLDG DWF APPROVAL OK to cover <br /> 11-INSULATION <br /> 12/19/2018 12/19/2018 BLDG DWF APPROVAL Drywall ok to cover <br /> 09-DRYWALL <br /> 12/27/2018 12/27/2018 GAS 01-ROUGH IN SDP CORRECTION (12/27/2018 3:03 PM SDP) <br /> The test on one of the gas lines is down, <br /> retest and recall please. <br /> 1/2/2019 1/2/2019 GAS 01-ROUGH IN SDP APPROVAL <br /> 1/31/2019 1/31/2019 GAS 03-FINAL SDP APPROVAL ok for service <br /> 2/25/2019 2/25/2019 PLUMB 06-FINAL SDP APPROVAL <br /> 2/25/2019 2/25/2019 MECH 06-FINAL SDP APPROVAL <br /> 3/15/2019 3/15/2019 BLDG 15-FINAL DWF APPROVAL as noted Contractor to install air seal gasket on attic <br /> access covers <br /> (3/18/2019 9:12 AM KLC) <br /> Need landscape final <br /> 3/25/2019 3/25/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 3/25/2019 3/25/2019 PLANNING KLH APPROVAL LANDSCAPE <br /> LANDSCAPING FINAL REQ'D <br /> 8/13/2019 8/13/2019 CERTIFICATE OF TAH APPROVAL CO ISSUED <br /> OCCUPANCY <br /> INSP12 YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.