My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6620 COMMERCIAL AVE 2020-05-07
>
Address Records
>
COMMERCIAL AVE
>
6620
>
6620 COMMERCIAL AVE 2020-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:02:00 PM
Creation date
5/7/2020 3:01:09 PM
Metadata
Fields
Template:
Address Document
Street Name
COMMERCIAL AVE
Street Number
6620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VORKS PERMIT <br /> ifil2gemig City of Everett Permit Services Public Works Permit#: P 019 <br /> 3200 Cedar Street,2"d Floor Associated Bldg Permit#: C1803-026 <br /> Date Applied: 7/12/2018Everett,WA 98201 Planning Reference#: <br /> PUBLI <br /> (425)257-8810 Public Works Fee: $65 <br /> 05 SEP 1018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BALTHIS JOSHUA LEE &JENNIFER ALICE REIMERS MARTIN <br /> 6620 COMMERCIAL AVE SE <br /> EVERETT, WA, 98203 <br /> PHONE: PHONE: 4253778786 <br /> TAX PARCEL ID#: 00544700303300 SITE ADDRESS: 6620 COMMERCIAL AVE <br /> DESCRIPTION: NEW BATHROOM ADDITION TO SFR, DUPLEX ADDITION <br /> (7/12/2018 2:53 PM BES) <br /> NEW BATHROOM ADDITION TO SFR, DUPLEX ADDITION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 07/12/2018. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> other inspection requests. <br /> 6. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Install new 6" Side Sewer Connection per City Standards 601 through 604. Existing side sewer is only 4". <br /> Public Works Permit Fee Breakdown: �� <br /> Misc. Minor Permits(Drainage Work) $25.00 11 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.001.] SEP 5 2018 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> q, bop- <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> —kgi © expenses,or causes of action that may arise because of installation and <br /> VII / 212 expenses, <br /> . maintenance of the improvement or other right-of-way use here to applied <br /> Appr'wed for Construction (•m^�c Work ) Da for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date ir.i2/1'L< 74--/t) <br /> Approved as Constructed (PW Inspector) Sig ure of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.