My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6620 COMMERCIAL AVE 2020-05-07
>
Address Records
>
COMMERCIAL AVE
>
6620
>
6620 COMMERCIAL AVE 2020-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:02:00 PM
Creation date
5/7/2020 3:01:09 PM
Metadata
Fields
Template:
Address Document
Street Name
COMMERCIAL AVE
Street Number
6620
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/2019 page p <br /> City of Everett <br /> 9:22:14AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. El 812-099 Site Address 6620 COMMERCIAL AVE <br /> Applied 12/13/2018 Applicant Lot <br /> Approved 12/13/2018 Owner BALTHIS JOSHUA LEE&JENNIFER ALICE Block <br /> Issued 12/13/2018 Contractor EVERLIGHT ELECTRIC LLC' Tract <br /> Parent Permit No. C1803-026 Description ELECTRICAL-ADDITION FOR NEW DWELLING UNIT TO CR <br /> Notes INCLUDES ADDITION TO SFR FOR NEW BATHROOM <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 12/14/2018 12/14/2018 ELEC 03-ROUGH SKB NO ACCESS 1:35pm <br /> IN <br /> 12/18/2018 12/18/2018 ELEC 08-OTHER SKB OTHER cancel.Wrong <br /> permit type call in. <br /> 12/18/2018 12/18/2018 ELEC 06-ROUGH SKB CORRECTION (12/18/2018 2:50 PM SKB) <br /> IN Provide properly size wires to old kitchen <br /> circuit in or properly size overcurrent <br /> devices.Check energy code for installation <br /> requirements behind haters and if a heat <br /> pump is required as this is an all electric <br /> heat unit.Not ready.Old unit wiring must <br /> be brought to current code where it has <br /> been altered. <br /> 12/18/2018 12/18/2018 ELEC 05-SERVICE SKB CORRECTION (12/18/2018 2:50 PM SKB) <br /> Tighten grounding electrode conductor <br /> connections.Load conductors cannot go <br /> through service cabinet.All grounding <br /> electrode conductor connections have to be <br /> done in an accessible location.Provide load <br /> calculation for each unit and entire service. <br /> 3/28/2019 3/28/2019 ELEC 06-ROUGH SKB APPROVAL eTRAKiT Inspection 3/27/2019 8:09 PM Josh Balthis <br /> IN Request <br /> Contact Name:Josh Balthis <br /> Site Address:6620 COMMERCIAL AVE <br /> Phone:2532615992 <br /> e-Mail:joshbalthis@gmail.com <br /> 3/28/2019 3/28/2019 ELEC 05-SERVICE SKB CORRECTION (3/28/2019 2:13 PM SKB) <br /> Counting electrical conductors must land <br /> on the grounded bus and not rely on the <br /> steel to ground the grounded bus.Only one <br /> grounding electrode conductor can land in a <br /> lug.Tighten grounding electrode conductor <br /> clamps on ground rods.Acorns must bite <br /> the ground rod with the bolt not the <br /> conductor. <br /> 4/10/2019 4/10/2019 ELEC 05-SERVICE SKB CORRECTION eTRAKiT Inspection 4/9/2019 4:48 AM Josh Balthis <br /> Request <br /> Contact Name:Josh Balthis <br /> Site Address:6620 COMMERCIAL AVE` <br /> Phone:2532615992 <br /> e-Mail:joshbalthi�a gmail.com <br /> (4/10/2019 2:16 PM SKB) <br /> Grounding electrode conductor is cannot <br /> rely on the steel.Grounding electrical <br /> conductors must either land on the <br /> grounded bus or have a main bonding <br /> jumper as a wire between the equipment <br /> grounding bus and the grounded bus. <br /> INSP12 CRI$V$YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.