Laserfiche WebLink
ICPM <br /> 10/31/2018 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attn: Tony Lee 1 <br /> RE: Addition Backflow Prevention at 5209 Evergreen Way,Everett <br /> Mr. Lee: <br /> This correspondence is in response to the letter sent to Asia First on 3/8/12 regarding the requirement <br /> for additional backflow prevention. <br /> Per the attached letter dated 10/4/18 sent to the city,the landlord has hired CPM to execute this work. <br /> CPM has hired Burns Fire Protection to execute this work. Burns Fire Protections has been contracted <br /> to do the work, and they have ordered the vault, lid and backflow assembly. All parts should be <br /> available in the next(+/-) 2 weeks. Once received,we will schedule the work. We would anticipate the <br /> work to be completed by November 30th 2018 provided the parts arrive and that we have no delays <br /> during the Thanksgiving holiday. <br /> Asia First(landlord),CPM and Burns Fire Protection agree to complete this work as expeditiously as <br /> possible. Grocery Outlet has agreed to provide Fire Watch as needed while this works takes place. <br /> Please feel free to contact me with any questions. <br /> CPM I Construction Preservation Maintenance <br /> 910117 <br /> Shane Tapert I President • <br /> Burns Fire Protections: Ot154 )4nAikDate: /OA M <br /> Dion Smith,VP <br /> Asia First Inc: Date: <br /> David Chen,Owner / "?' <br /> CONSTRUCTION ( PRESERVATION I NIAINTENANCE <br /> PC 8 O 51 1123 5 N 6 H Q M I 5 tI . W A 9 5 2 9 1 , 3 0 0 . 3 3 3 6 7 0 5 CP MN 4V CO M <br />