Laserfiche WebLink
Permit# 11703-019 <br /> Site Address- 02 LOMBARD AVE SE <br /> Owner: SLANE JOHN <br /> Tenant: [TenNamej <br /> Instructions,finishing the basement. App.Date: 3/23/2017 <br /> Proposed Use: SFR DETACHED <br /> Step 1, wall (See Drawings) Description: FINISH BASEMENT,PERMIT WORK DONE <br /> BY PREV OWNERS <br /> Drywall built furled out from main concrete wall <br /> Reviewed By: � Date: <br /> 1. Clean concrete wall of dust and debris (Office Set Job Site Set Fire/Planning Set <br /> 2. Apply adhesive to the wall <br /> 3. Attach foam insulation directly to concrete wall <br /> 4. Build wooden wall frame <br /> a. Attach pressure treated base 2x4 to the ground first with adhesive,then with 3" nails <br /> driven through the base into the concrete below it.The base must be at least 1/2" <br /> separated from the foam, creating an empty space. <br /> b. Attach vertical 2x4 studs to the base with elbow joints and 1" screws. <br /> c. Attach the top 2x4 along the top of the studs,fastened to each stud with elbow joints <br /> and screws. <br /> d. Fasten the top 2x4 to the joists in the ceiling with screws. If necessary add shims so <br /> there is no space between the wood frame and the joists. <br /> 5. Cover the gap between the top of the wooden frame and the concrete wall behind it with a thin <br /> piece of drywall,this will cover the gap created by the empty space,working as a fireblock. <br /> Fasten in place with adhesive. <br /> 6. Insert fiberglass insulation between the studs and fasten in place. <br /> 7. Attach drywall to the front of the wooden frame and fasten with screws going through the <br /> drywall into the wooden studs behind it. <br /> Note: The concrete wall has two different configurations, depending one which wall in the <br /> basement you are looking at, which affect the placement of the fireblock.These configurations are <br /> denoted in the attached drawings. <br /> Step 2,floor <br /> Wood laminate flooring iftig91!1. Clean floor APR 12 240 <br /> 2. Lay down underlayment CIT <br /> y <br /> 3. Lay down wood laminate Pe m SerIRE?"f <br /> es <br /> Step 3, Ceiling(See Drawing) <br /> Acoustic drop ceiling <br /> 1. Attach wall angles with screws <br /> 2. Attach suspension wires to ceiling joists with screws <br /> 3. Suspend T supports from suspension wires(first main Ts,then cross Ts) <br /> 4. Position ceiling panels into T supports <br />