|
elPfr
<br /> WAC 29646B-900: ELECTRICAL PLAN REVIEW
<br /> DIRECTIONS: Read the WAC section below to determine if plan review is required or not required.Then select the box next to(a)to
<br /> tell City Staff if plan review is not requried and select the box next to the specific reason from WAC 296-46B-900. If plan review is
<br /> required, select the box next to(b)and (c)to acknowledge that plan review is required and the electrical plans have been provided
<br /> with this permit application.
<br /> *If item(a)-(ii,iii,or v)is selected,the work must also comply with section (a)-(vii).See arrow flow chart below.
<br /> (3)Electrical plan review.
<br /> 0 (a) Electrical plan review is not required for:
<br /> ❑ (i)Low voltage systems;
<br /> -4--0 (ii)Lighting specific projects that result in an electrical load reduction on each feeder involved in the project;
<br /> ❑ (iii)Heating and cooling specific retrofit projects that result in an electrical load reduction on each existing feeder
<br /> involved in the project, provided there is not a corresponding increase in the available fault current in any feeder.
<br /> (iv)Stand-alone utility fed services that do not exceed 250 volts,400 amperes where the project's distribution system
<br /> o does not include:
<br /> (A) Emergency systems other than listed unit equipment per NEC 700.12(F);
<br /> (B)An essential electrical system defined in NEC 517.2;or
<br /> (C)A required fire pump system.
<br /> ❑ (v)Modifications to existing electrical installations where all of the following conditions are met:
<br /> (A)Service or distribution equipment involved is rated not more than 400 amperes and does not exceed
<br /> 250 volts or for lighting circuits not exceeding 277 volts to ground;
<br /> (B) Does not involve emergency systems other than listed unit equipment per NEC 700.12(F);
<br /> (C)Does not involve branch circuits or feeders of an essential electrical system as defined in NEC 517.2;
<br /> and
<br /> (D)Service or feeder load calculations are increased by 5%or less.
<br /> (vi)Electric power production source(s)such as solar photovoltaic,fuel cell, or wind electric system(s)with a total
<br /> ❑ rating of 9600 watts or less.
<br /> (vii)For installations in(a)(ii),(iii), and(v)of this subsection to be considered,the following must be available
<br /> ❑ to the electrical inspector before the work is initiated:
<br /> (A)A clear and adequate description of the project's scope;
<br /> (B)A load calculation(s);
<br /> (C)What the load changes are, providing both before and after panel schedules as needed; and
<br /> (D)Provide information showing that the service and feeder(s)supplying the panel(s)where the work is
<br /> taking place has adequate capacity for any increased load and has code compliant overcurrent protection
<br /> for that supply.
<br /> NOTE: Electrical plan review is not required for"Medical,dental, and chiropractic clinic"of which is a clinic or
<br /> ❑ physicians'office where patients are not regularly kept as bed patients for twenty-four hours or more, per section
<br /> (1)(c)(xii).
<br /> ®
<br /> (b) Electrical plan review is required for all other new or altered electrical projects in educational, institutional, or health care
<br /> occupancies defined in this chapter.
<br /> 0 (c) If a review is required,the electrical plan must be submitted for review and approval before the electrical work is begun.
<br /> Table 9004 Table 99Q-2
<br /> Health or Personal Care Facilities Educational and Institutional Facilities.•Pieces at Assembly.Or Other I;acilitii.s
<br /> ttea Ire,or Porsourai Care Facility Pian Review
<br /> Type Required Educational.1nstltutionai,or Plan Regia€ew
<br /> �_.._� _
<br /> .: ; Other Facal,ty Types Re ,
<br /> r
<br /> ecl
<br /> $ f.trr= vp7
<br /> _— —_ _ caccatcral fSfn; tirrt,I:nir r,; nri;-terw
<br /> Yes
<br /> ,ne.Unit s-_tiut;c r1 1 !Er:
<br /> rsyrttirH^f^+p,f-•------..�.� Yes
<br /> .,,,A.,trt4 is,"rnt;fatiut;c5. Yes
<br /> rkw,e,,,Flrnhfllis..ilos)Itii Y s Notes to Tables ao@.1and 9CO.2.
<br /> r,I.;uvrrr yr.+,rrrlt. +,. pitrI Yr- i heitral, cr 'd`.c..c . c r .a :a p c*Sr 2:
<br /> 4 et5'n'F 5.$r,'1 Yes r ay reci,rs r c .rcr'e JJ r„r',,c t,ty,G_c r-.t
<br /> ,obutmaysur&i'yf celty Yes re,ewe dcy+-,eoesaTn-e
<br /> t•,:o..ti h,e.ryil liy.. dlnI+. Yes
<br /> K.:d'Jt.nt!FP t.ecce er t fatl'lly Yes
<br /> iii
<br /> /�
<br /> tkhvtiWN•ls�iVl:ef�CP6PCy Yes '� 1 -Vi�
<br /> „r,ltr•_ tr rtll,!ie`!abIheatior= Yes PERMIT# tv"\ - Page 2-Plan Revi
<br />
|