My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 4/1/2020 Change Order 21
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 4/1/2020 Change Order 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 10:21:26 AM
Creation date
5/11/2020 10:20:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
4/1/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
21
Tracking Number
0000801
Total Compensation
$89,164.17
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Concrete Due to Landings/Ramps <br /> UPPER DECK <br /> U15 Landing to Stairs <br /> Volume <br /> Length Delta Slope Add'I Ht Width (CF) Total CY <br /> 5.167 0.047 0.242849 13.5 8.5 0.31 <br /> 32.5 0.047 0.242849 13.5 53.3 1.97 <br /> Stairs to West Landing <br /> Length Delta Slope Add'I Ht Width Volume <br /> 5.167 0.044 0.227348 7.5 4.4 <br /> 33 0.044 0.227348 7.5 28.1 <br /> 32.5 <br /> 2 landings/ramps 65.1 2.41 <br /> LOWER DECK <br /> M13 to Stairs <br /> Length Delta Slope Add' Ht Width Volume <br /> 5.167 0.044 0.227348 7.5 4.4 <br /> 22.67 0.044 0.227348 7.5 19.3 <br /> 23.7 <br /> 2 landings/ramps 47.5 1.76 <br /> Stairs to M6 <br /> 5.167 0.044 0.227348 13.5 7.9 <br /> 25 0.044 0.227348 13.5 38.4 <br /> 46.3 <br /> 2 landings/ramps 92.6 3.43 <br /> M6 to M1 <br /> 5.167 0.04 0.20668 13.5 7.2 <br /> 41.5 0.04 0.20668 13.5 57.9 <br /> 65.1 <br /> 2 landings/ramps 130.2 4.82 <br /> CY <br /> TOTAL ADDED CONCRETE 14.71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.