My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 20
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:25:17 PM
Creation date
5/11/2020 12:24:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
20
Tracking Number
0000801
Total Compensation
$175,720.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B A equesi Tor wr000sai <br /> Adogrr <br /> Date Created RFP No. 06 <br /> Budget No. Federal Aid No. <br /> Project Number Project <br /> Subject * Galvanized Steel Handrail <br /> Specification(s) <br /> Plan Reference <br /> To: IterNest Can=_ruc ior. Inc. <br /> Provide proposal within fifteen (15) days or as stated above for the scope of work described: <br /> NOTE: This is NOT a change order and does NOT constitute approval or notice to proceed on the issue. <br /> SCOPE: <br /> Furnish and install 1-1/4" galvanized steel , Sch. 40 handrail/brackets. The handrail will be installed per original <br /> contract plans with the following exceptions: <br /> 1. The lower deck, both north and south side, between M1 and M15 will need to be asbuilt to incorporate the <br /> ramps/landings. <br /> 2. The upper deck, both north and south side, between stations 10+66 and 12+13 will need to be asbuilt to <br /> incorporate the ramps/landing. <br /> The transition deck, west tower upper landing and west tower stairs will remain per original contract. <br /> Revision 10/29/19: Also include separate pricing for installing 1.5" OD stainless steel tubing and brackets for <br /> the entire bridge similar to Galvanized Steel request above. <br /> MATERIAL: <br />
The URL can be used to link to this page
Your browser does not support the video tag.