Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 20 <br /> Change Order Effective Date: 12-06-2019 <br /> CONTRACTOR <br /> By ia r A0--l.y`1/-- <br /> Officer Date: /2/3/ /19 <br /> Exhibit A—Description of Changed Work <br /> Mt. Norway Fabrication Chanjies: <br /> 1. The SS handrail per Change Order 14 is eliminated. Domestic 304 stainless steel handrail and <br /> brackets will be installed for the entire pedestrian bridge at the locations identified on the <br /> original contract documents A4.1 and A5.0. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 4 (four)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for deletion of existing bid item and addition of new bid item. <br /> Submittals <br /> Submit shop dwgs for handrail. Submit certificate of material origin and material certification for all <br /> stainless steel handrail and brackets. <br /> Measurement and Payment <br /> Cost for stainless steel handrail shall be by linear foot installed and include all labor, materials, <br /> equipment necessary. <br /> ATTACHMENTS(11 Additional Pages) <br /> • Exhibit C-New Bid Items and Changes to Existing Bid Items <br /> • Original A4.1, A5.0 (reference only for handrail location) <br /> • Revised SP 6-06.6 <br /> • Interwest Construction COP 022, dated 11/22/19 <br /> Page 3 of 3 <br />