My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 20
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:25:17 PM
Creation date
5/11/2020 12:24:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
20
Tracking Number
0000801
Total Compensation
$175,720.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> November 22nd, 2019 COP 022 <br /> Ken Kettel, P.E.,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett,WA 98201 <br /> RE: COP 018: Galvanized Steel Handrail per RFP 06 <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to provide pricing for changes to Bid Item B 105 as directed by the Engineer per RFP <br /> 006. <br /> The Engineer wishes to delete Bid Item B105 and create a new bid item for 1460 LF of similar <br /> handrail constructed of different materials. Interwest's proposal includes the following <br /> clarifications: <br /> • Materials quoted are domestic and include 1.5"O.D. x 0.120"wall tubing for rail <br /> • Stainless Steel is quoted with a#4 circumferential finish, 304 alloy <br /> • Sales tax has been included on materials <br /> • Pricing presented here-in is valid for 14 days due to material cost fluctuations. <br /> Interwest offers the following pricing options: <br /> Item Description Quantity Unit Unit Price Total Price <br /> B105 Throw Barrier SS Handrail -500 LF $180 -$90,000 <br /> B105R1 Handrail - Galvanized Steel 1460 LF $118 $172,280 <br /> B105R2 Handrail - Stainless Steel Orb. Finish 1460 LF $182 $265,720 <br /> B105R1: B105R2: <br /> Galvanized Stainless <br /> Handrail Handrail <br /> As-Built/Coord $ 10,530.00 $ 10,530.00 <br /> Layout/Hardware $ 26,630.00 $ 26,630.00 <br /> Install $111,920.00 $193,675.00 <br /> Subtotal $149,080.00 $230,835.00 <br /> Footage(LF) 1460 1460 <br /> Cost per LF $ 102.11 $ 158.11 <br /> Markup 15% 15% <br /> Proposed Price per LF $ 118.00 $ 182.00 <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI121 OF <br /> 1 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.