Laserfiche WebLink
• KB A' { Request for Proposal (REP) <br /> Date 10/20/2017 RFP No. * 02 <br /> Project Number Federal Aid No. <br /> Project Name <br /> Subject * Revised East Slope Landscape and Irrigation <br /> Specification <br /> Reference <br /> Plan Reference <br /> To: Interwest Construction, Inc. <br /> Provide proposal within fifteen (15) days or as stated above for the scope of work described: <br /> NOTE: This is NOT a change order and does NOT constitute approval or notice to proceed on the issue. <br /> SCOPE <br /> 101 GAPB RFP-02 Revised Slope Plantings and Irrigation.pdf <br /> Contractor shall eliminate landscape and irrigiaton from the east slope between BNSF property and the top of the <br /> slope per the attached plans. Clearing only will be as shown between BNSF ROW and the station 11+70. Existing <br /> vegetation will be cut down to grade, but not grubbed. Between station 11+70 and the top of the slope, the grade <br /> shall be cleared, grubbed and graded per the contract plans with the exception that the amended topsoil to be <br /> placed shall only be 6" in depth as shown on C6.2. In lieu of planting the 21 RBU shrubs, the contractor will install up <br /> to 50 Nootka Rose live stakes/cuttings at the direction of the City. There will be no Hydroseed slope preparation or <br /> seeding between the BNSF ROW and station 11+70. The wire mesh slope stabilization and the fabric beneath it will <br /> be installed per contract plans and as approved through separate shop drawing submittal. <br /> MATERIAL <br /> Nootka Rose Live Stake/Cuttings <br />