My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 19
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:40:24 PM
Creation date
5/11/2020 12:40:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
19
Tracking Number
0000801
Total Compensation
-$19,472.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• KB A' { Request for Proposal (REP) <br /> Date 10/20/2017 RFP No. * 02 <br /> Project Number Federal Aid No. <br /> Project Name <br /> Subject * Revised East Slope Landscape and Irrigation <br /> Specification <br /> Reference <br /> Plan Reference <br /> To: Interwest Construction, Inc. <br /> Provide proposal within fifteen (15) days or as stated above for the scope of work described: <br /> NOTE: This is NOT a change order and does NOT constitute approval or notice to proceed on the issue. <br /> SCOPE <br /> 101 GAPB RFP-02 Revised Slope Plantings and Irrigation.pdf <br /> Contractor shall eliminate landscape and irrigiaton from the east slope between BNSF property and the top of the <br /> slope per the attached plans. Clearing only will be as shown between BNSF ROW and the station 11+70. Existing <br /> vegetation will be cut down to grade, but not grubbed. Between station 11+70 and the top of the slope, the grade <br /> shall be cleared, grubbed and graded per the contract plans with the exception that the amended topsoil to be <br /> placed shall only be 6" in depth as shown on C6.2. In lieu of planting the 21 RBU shrubs, the contractor will install up <br /> to 50 Nootka Rose live stakes/cuttings at the direction of the City. There will be no Hydroseed slope preparation or <br /> seeding between the BNSF ROW and station 11+70. The wire mesh slope stabilization and the fabric beneath it will <br /> be installed per contract plans and as approved through separate shop drawing submittal. <br /> MATERIAL <br /> Nootka Rose Live Stake/Cuttings <br />
The URL can be used to link to this page
Your browser does not support the video tag.