My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 19
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:40:24 PM
Creation date
5/11/2020 12:40:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
19
Tracking Number
0000801
Total Compensation
-$19,472.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> GAPS:East Slope Modification <br /> PPP:GOS Pao.OE <br /> October 20,SW <br /> BRIDGE STRUCIVRE <br /> PILE UP SEE <br /> v FROWN L Tt.. rm�xm cPwc ® <br /> a <br /> RIANNET INTO SLOPE ..` on * /a EAST ORME <br /> APPROXIMATELY <br /> i,;naaeaA,o __ =ANON OE <br /> RIDGE o�xE I / oNaOE <br /> RNA __T� L IX--- <br /> KAM.MD PRE NESH <br /> CRAPE <br /> pNm� neuN mxisx <br /> 5 sQUARRAU._ IkPOPE STAZIPATION <br /> irex PROMS, IV SSFII <br /> �� I.STEEL PIPE <br /> FOR <br /> CUSPED STOP. <br /> • <br /> �.'_.a° <br /> °a° <br /> u GRADING SECTION—BURID SD & GS PIPES <br /> ,$ °WIRE MESH SLOPE STABILIZATION <br /> 8 <br /> I I <br /> 6 „: /R usr EppRopLLATELy <br /> punNE4 4 . <br /> JOINT <br /> SF11 LOCATOR OF <br /> BRIDGE <br /> XV BRIDGE ' I <br /> SO.SPODE EarsiN2"." <br /> SUPPORTED STEEL Pa FOR STORM:EwE`a`\L WWII.SPY. <br /> NNrs mGRADE --,,. . <br /> I <br /> C GRADING SECTION—ALL PIPES ON BRIDGESTAIR GRADING <br /> CS1 SOME.,-to CS D,Cp,p <br /> ,}�7,' � CITY OF EVERETT GRAND AVENUE PARK BRIDGE <br /> /' � GRADING DETAILS C6.: <br /> _ WO T588 AND SECTIONS <br /> NO oATE APIND REVISION �,". Id PUBLIC WORKS <br /> 171:. oa— 2PA5 ISSUES FOE: EVEETTDEPARTMENT <br /> AON.Vn+IAZ IaOLTINOsN.W x ug i,nN LATE WPY g(tFE_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.