Laserfiche WebLink
GAPE:Bast Slope Modification <br /> SPIN:002 Pape or <br /> October 20,2017 <br /> Plant Schedule <br /> 6. <br /> °.a.De..*. RS Sn On PLANTING NOTES: <br /> 1. TREE LOCATIONS TO BE COORDINATED WITH EXISTING AND PROPOSED UNDERGROUND <br /> UTILITIES TO ACHIEVE SEPARATION PER JURISDICTPNAL REQUIREMENTS.VERIFY <br /> UTILITY LOCATIONS PRIOR TO FLANTNG TREES.NOTIFY LANDSCAPE ARCHTECT IF <br /> sv1 I:pec.m ll...wbWa pl.em not em ae41 sx note I PROPOSED TREE LOCATION CONFLICT WITH UTILITY LOCATION. <br /> 2. ALL PLANTING SHALL BE IN COMPLIANCE WITH CITY OF EVERETT PROCEDURES. <br /> GP aclalanemASnIAS Me Pa Obi_==} irc.vee 3. ESTABLISH SUBORADE ELEVATIONS THAT WILL ACCOMMODATE PLANTING SOIL DEPTHS. <br /> PREPARE AS DETAILED IN THE DRAWINGS AND SPECIFICATIONS. <br /> Pr..UMN.VTw <br /> CID3 Comm KLVY130y.s6 p map 4 4. ALL LANDSCAPE AREAS SHALL RECEIVE DEPTH OF TOPSOIL COMPOST AND/OR <br /> wA v.m.we..,e.Aw.W.e.e vo4Nr0 Dam, tulle 2 MULCH PER SPECIFICATIONS AND PLANTING NOTES.ALL AREAS SHALL BE FINE <br /> GRADED TO AVOID HIGH OR LOW SPOTS AND PROVIDE POSTME DRAINAGE AT 2% <br /> M�9¢lvvwnT� MIN SLOPE,UNLESS OTHERWISE SHOWN OR NOTED IN THE DRAWINGS. <br /> ANTE Mew.emw.MIAMeami 1'cMRe 4 5. ALL PLANT MATERIAL SHALL BE NURSERY CROWN NOT FIELD COLLECTED), <br /> HEALTHY <br /> VIGOROUS <br /> PALL.WTI EE OFPED C SPDIIE SE AND <br /> AILE ORMS SOUND, <br /> HETTMT VIGOROUS PLANTS,FREE OF DEFECTS,DISEASE AUTO ALL FORMS OF <br /> • .8 7 -.--,^ INFESTATION.ME45UREMENIS.CALPER.BRANCHING.GRADING OUP1f1Y,flLLLING AUTO <br /> '»T:B�Gnrearre.W..ltalra..aw lexaa(.9-- -2P1 BURLAPPING PLANT MATERIAL SHALL CONFORM TO MINIMUM STANDARDS OF ANSI <br /> TA, ne6.1 He.. 260.1,LATEST EDITION. <br /> �ieYO—Rotuma <br /> �'�OOISCB I - I a __R I 6. LAYOUT OF PLANTING BEDS ADO PLACEMENT OF TREES,SHRUBS.GROUNDCOVERS <br /> bon. �Ipn1uF uwl ?°I380 SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br /> von <br /> � i3.YM VA.a.MSN*ae0V .MM..w1 Ie SCSI II T. STREET TREES SHALL BE INSTALLED CENTERED IN PLANTING STRIP.TREES MUST BE <br /> LOCATED A MINIMUM OF 36 INCHES FROM FACE OF CURB,5 FEET FROM <br /> UNDERGROUND UTILITY LINES. <br /> MO p"I.SDe,Wlea....Jymu lb.pat Pt.a.D.Tamwml 5 O.poet 30 8. SPECIMEN CONTORTED PINE SHALL BE PILAUS PARVIFLORA CJAPANESE PINE')0 24. <br /> VA e.,sR.D..MHA Aeop„me(.60TJy"..e.°^O SOX,6'WIDE,4'TALL ASYMMETRICAL SPECIMEN mars ACCEPTABLE TO THE <br /> '1i1pal. LANDSCAPE ARCHITECT IN ALL RESPECTS. <br /> Per Ta.xi,.mwv TNe.Ar9ele Y.a u'n a 9. THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO INSPECT AND/OR TAG ALL OR <br /> SOME TREES AND SHRUBS AT THE NURSERY SOURCE.REVIEW ALL PLANT MATERIAL <br /> SPECIES AND PROPOSED NURSERY SOURCES WITH THE LANDSCAPE ARCHITECT AT <br /> mel...Vaw a AiE LEAST 30 DAYS PRIOR TO PLANTING OPERATIONS. <br /> OuaB.q <br /> CID tA"im�'nMm ,s el. (Tr.Im.etn Fax.) PubU 10.SUBSEQUENT TO SUE CONSTRUCTION,ALL AREAS IN CRZ AND LAY-DOWN AREAS <br /> _ _ _ SHP LL.y. W.LL WOODCHIP MULCH REMOVED AND SURFACE PREPARED AND S BE <br /> (SMOG,C.W prWl I1.EXCEPT FOR AREAS WMTIN THE CR2.AND UNLESS OTHERWISE NOTED IN THE <br /> DRAWINGS OR SPECIFICATIONS,NI AREAS DICTURBFO DURING UC SHALL <br /> LAH w Is ..au.MT H'.010.M 0 a 9a+lebb11 HAVE THE SUBGRADE SCARIFIED TO A DEPTH OF 2 SHALL HAVEUE FINE COMPOST <br /> c' J..el ADDED AT AN UNCOMPACTED DEPTH OF Z"MIN.,SHALL BE ROTOTILLED IN TWO <br /> } 03s3 Loy Deb euoalammWyM .I �I Pub DIRECTIONS,SHALL HAVE TOPSOIL ADDED AT AN UNCOMPACTED DEPTH OF]"MIN., <br /> F NM _� � SHALL AGAIN BE ROTOTILLEO IN MVO DIRECTIONS,SHALL BE LIGHTLY COMPACTED, <br /> POP Mmn.L.,Iwm.wl AND SHALL HAVE THE SPECIFIED SURFACE MATERAL/TREATMENT PLACED OVER.THIS <br /> p "T.t.LM,V�1..p0 OPERATION,AFTER LIGHT COMPACTION,SHALL YIELD A 12"THICK MIXTURE OF <br /> Prnsan nwy p�see.t..Shmo.l Ivew eR.3 ___ 43.5 TOPSOIL COMPOST,AND SUBSOIL THAT IS GRADED FROM FINE TO ROUGH FROM <br /> PAS 1pn.wPub30P1 FINISHED GRADE DOWN TO THE SUBGRADE.SEE ADDITIONAL NOTES-THIS SHEET <br /> Z q,,M FOR ADJUSTME <br /> NTS TO SPECIFIED FINISHED GRADES TO ALLOW FOR ADDITIONAL <br /> d spins.a.M m we OrNS b. FUTURE SETTLEMENT. <br /> e TRWvon MSDD Web 10 <br /> VonnornI ROTA I D.,I„q tM TS2M0� 3Dep. as 12.THE INITIALLY INSTALLED,SUITED,AND/OR COMPACTED FINISHED GRADES FOR <br /> LANDSCAPE TREATMENTS SHALL BE SET T 2"ABOVE ALL ADJACENT HARD SURFACES <br /> ' TO ALLOW FOR ADDITIONAL FUTURE SETTLEMENT.THIS MAT CAUSE SHORT-TERM <br /> ________ DRAINAGE POSITING IN SOME AREAS.WHICH IS EXPECTED AND ACCEPTABLE TO THE <br /> . OWNER.THE FINISHED GRADES FOR SURFACE MATERNL/TREATMENTS ARE AS <br /> FOLLOWS: SOD-THATCH UNE,MULCH-TOP OF MULCH,HYDROSEED-TOP OF <br /> HYDROMULCH. <br /> 13.THE CONTRACTOR SHALL COORDINATE THE OPERATIONS OF EXCAVATION/EARTHWORK <br /> AND LANDSCAPING TO ENSURE THAT SUBGRADES ARE GRADED TO ME ELEVATIONS <br /> SPECIFIED IN THE DRAWINGS,INCLUDING THE ALLOWANCE FOR ADDITIONAL FUTURE <br /> 8 SETTLEMENT(SEE NOTE 11-THIS SHEEP. <br /> ° a„ GRAND AVENUE PARK BRIDGE <br /> • 'u� CITY OF EVERETT WO #3588 L1.0. <br /> 410 PLANT SCHEDULE _ <br /> No.'onrel'IAP""RVD ADDEND.RensioriELCTIo"DF"" A„, "" A PUBLIC WORKS - -- <br /> BD I�rI ly PLANS ISSUED IFOOORR::: I,.,., ;E EB rr DEPARTMENT 34 ) <br /> ACTION:1,14E [Al iA (ACTION:BATE WPRdD(ACTION:1TATE JAPE.r m°e i ie �.. / <br />