Laserfiche WebLink
Project: Grand Avenue Park Bridge <br /> Change Order No.: 19 <br /> Change Order Effective Date: 11-21-2019 <br /> CONTRACTOR <br /> By fit( -tL ik Date: /Z //19 <br /> Interwest Construction Officer <br /> By Date: ` \ VC:\ <br /> Out est Landscape Officer <br /> Exhibit A--Description of Changed Work <br /> Revised East Hillside Slone Irrigation and Landscaping—Irrigation and landscaping eliminated from <br /> east hillside. See attached RFP-02, dated 10/20/17, for the description of work. The irrigation <br /> controller on the west side was replaced with 5 individual battery operated valves at the request of the <br /> Port of Everett. <br /> Exhibit B---Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid items and quantity changes to existing bid items. <br /> Measurement and Payment <br /> Measurement and Payment for the new bid items shall be as listed on the attached page. <br /> ATTACHMENTS(1 5 Additional Page) <br /> • Bid Item Changes <br /> • Credit for West Side Controller <br /> • ICI COP 005, dated 4/26/17 <br /> Page 3 of 3 <br />