My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 19
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:40:24 PM
Creation date
5/11/2020 12:40:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
19
Tracking Number
0000801
Total Compensation
-$19,472.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 19 <br /> Change Order Effective Date: 11-21-2019 <br /> CONTRACTOR <br /> By fit( -tL ik Date: /Z //19 <br /> Interwest Construction Officer <br /> By Date: ` \ VC:\ <br /> Out est Landscape Officer <br /> Exhibit A--Description of Changed Work <br /> Revised East Hillside Slone Irrigation and Landscaping—Irrigation and landscaping eliminated from <br /> east hillside. See attached RFP-02, dated 10/20/17, for the description of work. The irrigation <br /> controller on the west side was replaced with 5 individual battery operated valves at the request of the <br /> Port of Everett. <br /> Exhibit B---Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid items and quantity changes to existing bid items. <br /> Measurement and Payment <br /> Measurement and Payment for the new bid items shall be as listed on the attached page. <br /> ATTACHMENTS(1 5 Additional Page) <br /> • Bid Item Changes <br /> • Credit for West Side Controller <br /> • ICI COP 005, dated 4/26/17 <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.