My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 1/28/2020 Change Order 19
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 1/28/2020 Change Order 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:40:24 PM
Creation date
5/11/2020 12:40:03 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
1/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
19
Tracking Number
0000801
Total Compensation
-$19,472.89
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ken Kettel <br /> From: Larsen, Renae L. <LarsenR@wsdot.wa.gov> <br /> Sent: Thursday,January 9, 2020 1:34 PM <br /> To: Ken Kettel; kalewine@everettwa.gov <br /> Cc: Ramirez, Vicki <br /> Subject: FW: GAPB - CO-19 Elim. East Hillside Landscape and Irrigation.pdf <br /> Attachments: GAPB - CO-19 Elim. East Hillside Landscape and Irrigation.pdf; GAPB COA DBE Tracking <br /> thru CO-19.pdf; CO-19 OutWest Letter.pdf <br /> Hi Ken, <br /> Here you go. Please keep a copy of this email in the CO back up and send me a copy of the executed change <br /> order. Thanks! <br /> Renae Larsen I Assistant Local Programs Engineer <br /> NWR Local Programs'WSDOT <br /> PO Box 330310,Seattle,WA 98133-9710 <br /> Email: LarsenR@WSDOT.WA.GOV I Phone:206.440.4733 <br /> From: Wonch, William<WonchW@wsdot.wa.gov> <br /> Sent:Thursday,January 9, 2020 1:21 PM <br /> To: Larsen, Renae L. <LarsenR@wsdot.wa.gov>; Ho,John <HoJohn@wsdot.wa.gov> <br /> Cc: Ramirez, Vicki <RamireV@wsdot.wa.gov> <br /> Subject: RE: GAPB-CO-19 Elim. East Hillside Landscape and Irrigation.pdf <br /> OEO has concurred with the proposed changes to the COA as shown in CO#19 (attached) <br /> These changes will not be entered into the database and DMCS will not reflect these changes until a copy of the executed <br /> CO# 19 is received for completion of the file. <br /> -�� <br /> Assistant Project Development Engineer - WSDOT <br /> PO Box 47390 • Olympia, WA 98504 <br /> 310 Maple Park Ave SE • Olympia, WA 98504-7390 <br /> <<mai lto:Wil liam.Wonch@wsdot.wa.gov» <br /> Phone: 360.705.7379 • <br /> http://www.wsdot.wa.qov/localprograms/ <br /> From: Larsen, Renae L. <LarsenR@wsdot.wa.gov> <br /> Sent:Tuesday,January 7, 2020 11:17 AM <br /> To: Ho,John <HoJohn@wsdot.wa.gov>; Wonch, William <WonchWPwsdot.wa.gov> <br /> Cc: Ramirez,Vicki <RamireV@wsdot.wa.gov> <br /> Subject: FW: GAPB - CO-19 Elim. East Hillside Landscape and Irrigation.pdf <br /> COA owner initiated Change order for your review. I have included the proposed COA chart and concurrence from the <br /> affected UDBE. The contractor anticipates to still exceed the commitment by approximately$200k. <br /> Renae Larsen Assistant Local Programs Engineer <br /> NWR Local Programs'WSDOT <br /> PO Box 330310,Seattle,WA 98133-9710 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.