IMCO General Construction 2/18/2020 Change Order 2
>
Contracts
>
Capital Contract
>
IMCO General Construction 2/18/2020 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 12:49:40 PM
Creation date
5/11/2020 12:49:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
2/18/2020
Department
Public Works
Department Project Manager
Zachary Brown
Subject / Project Title
WPCF Chlorination Building Upgrade
Public Works WO Number
UP3614
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001476
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction Inc 11/13/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WPCF Chlorination Building Upgrade <br /> Change Order No. 02 <br /> Change Order Effective Date: January 24, 2020 <br /> CONTRACTOR <br /> By Date: ( `7 l zv Z <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> 1. Change Order#2 is a time only Change Order. This Change Order formally adds the calendar <br /> days previously agreed to in the individual Work Change Directives. <br /> 2. Add the following calendar days to WO 3614. <br /> WCD-001 Added Bank Armoring: Increase Contract Time by 2-Days. <br /> WCD-002 Move Box Culvert: Increase Contract Time by 2-Days. <br /> WCD-003 Revise Fall Protection: Increase Contract Time by 5-days. <br /> WCD-005 Metering Pump Power Revision: Increase Contract Time by 1-Day. <br /> WCD-006 Generator Conduit Revision: Increase Contract Time by 1-Day. <br /> WCD-007 Roof Joist Revisions: Increase Contract Time by 6-Days. <br /> WCD-019.01 Additional Fall Restraint System: Increase Contract Time by 1-Day. <br /> WCD-020 Revise CMU Reinforcing Steel: Increase Contract Time by 5-Days. <br /> WCD-023 Added Containment Trench Coating: Increase Contract Time by 3-Days. <br /> WCD-030 Provide and Install Instrumentation Cable: Increase Contract Time by 1-Day. <br /> WCD-031 Outfall Dewatering Pipe Extension: Increase Contract Time by 1-Day. <br /> WCD-033 Relocate Unit Heater 510: Increase Contract Time by 1-Day. <br /> WCD-034 Revise IGP Pressure Indicating Transmitters: Increase Contract Time by 1-Day. <br /> WCD-035 Additional Valve Tags: Increase Contract Time by 1-Day. <br /> WCD-036 Revise Pipe Labels: Increase Contract Time by 1-Day. <br /> WCD-037 Revise Metering Pump Piping: Increase Contract Time by 1-Day. <br /> WCD-038 Temporary Repairs—Outfall Manhole: Increase Contract Time by 2-Days. <br /> WCD-040 Salvage Existing Communications Cable: Increase Contract Time by 1-Day. <br /> Total: 36-Days <br /> JUSTIFICATION: <br /> Please see the respective Work Change Directives. <br /> Page 3 of 3 <br />