IMCO General Construction 3/16/2020 Change Order 3
>
Contracts
>
Capital Contract
>
IMCO General Construction 3/16/2020 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 1:03:08 PM
Creation date
5/11/2020 1:03:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
3/16/2020
Department
Public Works
Department Project Manager
Zachary Brown
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001476
Total Compensation
$11,077.43
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction Inc 11/13/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WPCF Chlorination Building Upgrade <br /> Change Order No. 03 <br /> Change Order Effective Date: February 25, 2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax,the amount of the change order for <br /> the changes described in Exhibit A,represents complete compensation for the changes <br /> described in Exhibit A,including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> L, <br /> David C.Hall,City Attorney <br /> ayor City Clerk / City Attorney <br /> Date: Date: 3 - l i-go9-G Date: 3 1 91.0 <br /> Recommended BE: <br /> Construction Project Engineer(if Engineering Department Director <br /> Manager(if applicable) anager(if <br /> applicable) a plicable) <br /> Date: 3--3-Zvi Date: OOZO ate: •.te: <br /> _ <br /> Page 2 of 5 <br />