Project: WPCF Chlorination Building Upgrade <br /> Change Order No. 03 <br /> Change Order Effective Date: February 25, 2020 <br /> future excavation.The water was able to infiltrate the future excavation because of the presence of <br /> quarry spalls in the lower section of the excavation.The existence of the quarry spalls was not shown <br /> in the geotechnical report and borings provided by the City's design engineers, resulting in a <br /> "changed" or"differing site conditions" situation. <br /> The differing site conditions encountered by the Contractor at the site resulted in the need to expend <br /> additional time, materials, equipment and labor to complete the Work at the new outfall manhole. <br /> New item#12 is being created to compensation the Contractor for this additional time, labor, <br /> equipment and materials as a result of the differing site conditions. <br /> CONTRACT TIME: Change order#3 adds 28-calandar days to the contract. <br /> In-order-for the Contractor to excavate for the outfall manhole an additional seven weeks of time <br /> was needed.The reduction in the piling saved three weeks of time, resulting in a gain of 4-weeks to <br /> the contract. <br /> Page 5 of 5 <br />