IMCO General Construction 3/16/2020 Change Order 3
>
Contracts
>
Capital Contract
>
IMCO General Construction 3/16/2020 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 1:03:08 PM
Creation date
5/11/2020 1:03:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
3/16/2020
Department
Public Works
Department Project Manager
Zachary Brown
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001476
Total Compensation
$11,077.43
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction Inc 11/13/2018
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: WPCF Chlorination Building Upgrade <br /> Change Order No. 03 <br /> Change Order Effective Date: February 25, 2020 <br /> future excavation.The water was able to infiltrate the future excavation because of the presence of <br /> quarry spalls in the lower section of the excavation.The existence of the quarry spalls was not shown <br /> in the geotechnical report and borings provided by the City's design engineers, resulting in a <br /> "changed" or"differing site conditions" situation. <br /> The differing site conditions encountered by the Contractor at the site resulted in the need to expend <br /> additional time, materials, equipment and labor to complete the Work at the new outfall manhole. <br /> New item#12 is being created to compensation the Contractor for this additional time, labor, <br /> equipment and materials as a result of the differing site conditions. <br /> CONTRACT TIME: Change order#3 adds 28-calandar days to the contract. <br /> In-order-for the Contractor to excavate for the outfall manhole an additional seven weeks of time <br /> was needed.The reduction in the piling saved three weeks of time, resulting in a gain of 4-weeks to <br /> the contract. <br /> Page 5 of 5 <br />