Jansen Inc 3/20/2020 Change Order 3
>
Contracts
>
Capital Contract
>
Jansen Inc 3/20/2020 Change Order 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 1:28:19 PM
Creation date
5/11/2020 1:28:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
3/20/2020
Council Approval Date
3/11/2020
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Everett Downtown Streetscape Improvement
Public Works WO Number
PW3553, PW3640, UP3648
Amendment/Change Order
Change Order
Amendment/Change Order Number
3
Tracking Number
0001861
Total Compensation
$708,861.41
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 6/10/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Everett Downtown Streetscape Improvement <br /> Change Order No.3 <br /> Change Order Effective Date: December 6, 2019 <br /> New Item # C-207—Delete Underground Directional Boring on Rucker Avenue. Add new item# <br /> C-207 entitled, "Delete Underground Directional Boring on Rucker Avenue" at the agreed to credit to <br /> the City of Everett of$44,408.00, resulting in a Contract decrease of$44,408.00. <br /> JUSTIFICATION <br /> New Item # C-206—Equitable Adjustment for Additional Time Required to Complete Concrete <br /> Pavement on Rucker Avenue. The project included two (2) separate bid alternates for final paving, <br /> one to pave with asphalt, and the other to pave with reinforced concrete. The concrete method is more <br /> time consuming and complex, but there weren't any additional working days in the Contract to account <br /> for paving with reinforced concrete. The contractor submitted a concrete paving schedule for Rucker <br /> Avenue that included time to sawcut joints into the pavement (which is necessary to prevent cracking <br /> of the new concrete panels) in compliance with the approved jointing plan. The appropriate time for <br /> sawcutting these joints extended well past the approved hours of work stated in the Contract. An <br /> additional twenty-nine (29) working days is required to complete the work in compliance with the <br /> approved plans and specifications. Because of the number of residents living in or near the work zone, <br /> granting a variance to the City of Everett Noise Ordinance to extend working hours into the night <br /> would have too severe of an impact. Since the contractor was restricted to the working hours within <br /> the Contract, and an inadequate number of working days was provided for these restricted hours,this <br /> new item is being added to account for costs incurred by the contractor for delays in the schedule. <br /> New Item# C-207—Delete Underground Directional Boring on Rucker Avenue. This new item is <br /> being added because the underground directional boring on Rucker Avenue was deleted in order to <br /> install electrical conduit using typical trench excavation methods. This new item is being added to <br /> account for an appropriate credit to the City of Everett for deleting this work. <br /> Cost of Change Order No. 3 <br /> Schedule C Costs: $708,861.41 <br /> Total Cost of Change Order No. 3: $708,861.41 <br /> Contract Time <br /> There are Twentynine (29) days added to the Contract, as a result of Change Order No. 3. <br /> Page 4 of 4 <br />