My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I TY OF <br /> EVERETT <br /> East Clearwell Roof Replacement <br /> Contract Between <br /> Owner and Design-Builder - Lump Sum <br /> This CONTRACT is made and entered into as of 2020, by and between the following <br /> parties,for services in connection with the Project identified below. <br /> OWNER: City of Everett <br /> DESIGN-BUILDER: Shearer&Associates, Inc. <br /> PROJECT: East Clearwell Roof Replacement <br /> In consideration of the mutual covenants and obligations contained herein, Owner and Design-Builder <br /> agree as set forth herein. <br /> Article 1 <br /> Scope of Work <br /> Design-Builder shall perform all design and construction services, and provide all material, <br /> equipment, tools and labor, necessary to complete the Work described in and reasonably inferable from <br /> the Contract Documents for a total not to exceed the Contract Price as defined in Article 6 below. This <br /> Contract is entered into pursuant to the provisions of Chapter 39.10 RCW. If the total cost to complete all <br /> of the Work exceeds the Contract Price, such extra costs shall be the responsibility of the Design-Builder <br /> unless the Contract Price is adjusted by Change Order pursuant to the terms of the Contract Documents. <br /> City of Everett—Contract Page 1 <br /> Between Owner and Design Builder—Lump Sum <br /> East Clearwell Roof Replacement Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.