My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
arising from the Work to Owner's Representative and, to the extent mandated by Legal <br /> Requirements, to all government or quasi-government authorities having jurisdiction over safety- <br /> related matters involving the Project or the Work. <br /> 2.8.3 Design-Builder's responsibility for safety under this Section 2.8 is not intended in any way <br /> to relieve Subcontractors and Sub-Subcontractors of their own contractual and legal obligations <br /> and responsibility for (i) complying with all Legal Requirements, including those related to health <br /> and safety matters, and (ii) taking all necessary measures to implement and monitor all safety <br /> precautions and programs to guard against injury, losses, damages or accidents resulting from <br /> their performance of the Work. <br /> 2.9 Design-Builder's General Warranty. In addition to any other warranty elsewhere in the Contract <br /> Documents (including without limitation in the Supplementary Conditions of Contract), Design- <br /> Builder warrants to Owner that the construction, including all materials and equipment furnished as <br /> part of the construction, shall be new unless otherwise specified in the Contract Documents, of <br /> good quality, in conformance with the Contract Documents and free of defects in materials and <br /> workmanship. This warranty obligation excludes defects caused by abuse, alterations,or failure to <br /> maintain the Work in a commercially reasonable manner. Nothing in this warranty is intended to <br /> limit any manufacturer's warranty which provides Owner with greater warranty rights than set forth <br /> in this Section 2.9 or the Contract Documents. Design-Builder will provide Owner with all <br /> manufacturers'warranties upon Substantial Completion. <br /> 2.10 Correction of Defective Work. In addition to any other obligation to correct defective work <br /> elsewhere in the Contract Documents(including without limitation in the Supplementary Conditions <br /> of Contract): <br /> 2.10.1 Design-Builder agrees to correct any Work that is found to not be in conformance with the <br /> Contract Documents, including that part of the Work subject to Section 2.9 hereof, within a period <br /> of one year from the date of Substantial Completion of the Work or any portion of the Work, or <br /> within such longer period to the extent required by any specific warranty included in the Contract <br /> Documents. <br /> 2.10.2 Design-Builder shall, within seven days of receipt of written notice from Owner that the <br /> Work is not in conformance with the Contract Documents, take meaningful steps to commence <br /> correction of such nonconforming Work, including the correction, removal or replacement of the <br /> nonconforming Work and any damage caused to other parts of the Work affected by the <br /> nonconforming Work. If Design-Builder fails to commence the necessary steps within such seven <br /> day period, Owner, in addition to any other remedies provided under the Contract Documents, may <br /> provide Design-Builder with written notice that Owner will commence correction of such <br /> nonconforming Work with its own forces. If Owner does perform such corrective Work, Design- <br /> Builder shall be responsible for all reasonable costs incurred by Owner in performing such <br /> correction. If the nonconforming Work creates an emergency requiring an immediate response, <br /> the seven day periods identified herein shall be deemed inapplicable. <br /> 2.10.3 The one year period referenced in Section 2.10.1 above applies only to Design-Builder's <br /> obligation to correct nonconforming Work and is not intended to constitute a period of limitations <br /> for any other rights or remedies Owner may have regarding Design-Builder's other obligations <br /> under the Contract Documents. <br /> 2.11 Design-Builder's Obligation to Perform. Design-Builder's obligation to perform and complete <br /> the Work in accordance with the Contract Documents shall be absolute. None of the following <br /> constitute an acceptance of Work that is not in accordance with the Contract Documents or a <br /> release of Design-Builder's obligation to perform the Work in accordance with the Contract <br /> Documents: <br /> 2.11.1. Observations by Owner; <br /> 2.11.2. Payment by Owner of any progress or final payment; <br /> East Clearwell Project General Conditions of Contract Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.