Laserfiche WebLink
Work or other reasonable alternatives. <br /> c. Be limited to the change in the critical path of a construction schedule, and any <br /> updates, attributable to the event or conditions which caused the request for <br /> adjustment. <br /> 8.3 In addition to Design-Builder's right to a time extension for those events set forth in Section 8.2.1 <br /> above, Design-Builder may also be entitled to an appropriate adjustment of the Contract Price; <br /> except that the Contract Price will not be adjusted for Force Majeure Events. <br /> Article 9 <br /> Changes to the Contract Price and Time <br /> 9.1 Authorized Changes in the Work <br /> 9.1.1 General. After execution of the Contract, Changes in the Work are effective solely by <br /> Change Order or Work Change Directive. <br /> 9.1.2 Change Order. A Change Order is a written instrument issued after execution of the <br /> Contract signed by Owner and Design-Builder, stating their agreement upon all of the <br /> following: <br /> 9.1.2.1 The scope of the change in the Work; <br /> 9.1.2.2 The amount of the adjustment to the Contract Price, if any; and <br /> 9.1.2.3 The extent of the adjustment to the Contract Time(s), if any. <br /> A Change Order shall constitute full payment and final settlement of all Claims for Contract <br /> Time adjustment and for direct, indirect,and consequential costs, including costs of delays, <br /> inconvenience, disruption of schedule, or loss of efficiency or productivity, related to any <br /> Work either recovered or affected by the Change Order, or related to the events giving rise <br /> to the request for equitable adjustment <br /> 9.1.3 Design-Builder Request for Change Order. Change Order requests may be initiated <br /> by Design-Builder in accordance with this subsection 9.1.3. <br /> 9.1.3.1 If Design-Builder believes that it is entitled to relief for any event or condition arising <br /> out of or related to the Work or Project, Design-Builder shall provide to Owner a written <br /> Notice of Intent to Submit a Request for Change Order no later than seven days after the <br /> event or condition giving rise to the claim for relief. <br /> 9.1.3.2 Unless the Owner's Representative issues written notice authorizing Design- <br /> Builder additional time to submit the Request for Change Order, Design-Builder shall <br /> provide a written Request for Change Order to the Owner's Representative no later than <br /> 21 days after delivery of the Notice of Intent to Submit a Request for Change Order. The <br /> Request for Change Order must include(a)specific dollar amount of the requested change <br /> to Contract Price, covering all costs associated with the requested Change Order; (b) <br /> specific request for change in Contract Time (number of days); and (c) all documentation <br /> supporting the Request for a Change Order, including but not limited to all cost records, <br /> schedule analysis, and the documents identified in the Contract Documents,that are in any <br /> way relevant to the Design-Builder's Request for Change Order. <br /> 9.1.3.3 Pending resolution of Design-Builder's Request for a Change Order, Design- <br /> Builder shall continue to perform all Work including, at the written request of the Owner, <br /> the work associated with the pending Request for Change Order. <br /> East Clearwell Project General Conditions of Contract Page 18 <br />