My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shearer and Associates Inc 3/9/2020
>
Contracts
>
Capital Contract
>
Shearer and Associates Inc 3/9/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:56:52 AM
Creation date
5/13/2020 11:55:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Shearer and Associates Inc
Approval Date
3/9/2020
Council Approval Date
2/12/2020
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
WFP East Clearwell Roof Replacement
Public Works WO Number
UP3662
Tracking Number
0002306
Total Compensation
$3,368,386.91
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2.2 Design-Builder shall receive 6% of fixed-price costs or 5% of the time-and-material costs <br /> owed directly to a Subcontractor for materials supplied and/or Work properly performed by that <br /> Subcontractor or owed directly to a Design Consultant for services it properly performs. <br /> 6.2.3 Each"lump-sum" Subcontractor of any tier shall receive 12%of fixed-price costs or 8% of <br /> the time-and-material costs of any materials properly supplied and/or Work properly performed by <br /> its own forces. <br /> 6.2.4 Each "lump-sum" Subcontractor of any tier shall receive 6% of fixed-price costs or 5% of <br /> the time-and-material costs owed directly to a lower-tier"lump-sum" Subcontractor for materials <br /> supplied and/or Work properly performed by that Subcontractor. <br /> 6.2.5 The total summed mark-up of Design-Builder and all Subcontractors of any tier shall not <br /> exceed 25%. <br /> 6.3 Pricing Components. The value of any changed Work that is compensable,of any disputed Work <br /> Change Directive and of any other increase or decrease in the Contract Price, including a Claim, shall be <br /> an agreed lump sum amount. If no such agreement is achieved, the value shall be limited to the following <br /> corn ponents: <br /> 6.3.1 Direct labor costs. These are the labor costs determined by either the estimated or actual <br /> number of additional craft hours and the hourly cost necessary to perform the change in the Work, <br /> or the unit labor costs applied to the material quantities and extended, provided the unit labor costs <br /> are developed from the above craft hour cost, whichever is applicable, according to industry <br /> practice.The hourly cost shall be based upon the following: <br /> 6.3.1.1 Basic wages: The hourly wage actually paid the laborers, apprentices, <br /> journeymen, and foremen performing and/or directly supervising the changed Work on the <br /> Site. The premium portion of overtime wages is not included unless pre-approved by <br /> Owner. <br /> 6.3.1.2 Fringe benefits: Fringe benefits paid by Design-Builder as established by the <br /> Washington Department of Labor and Industries or contributed to labor trust funds as <br /> itemized fringe benefits, whichever is applicable. <br /> 6.3.1.3 Workers' insurances: Direct contributions to the State of Washington as <br /> industrial insurance;medical aid; and supplemental pension by class and rates established <br /> by the Washington Department of Labor and Industries. <br /> 6.3.1.4 Federal insurances: Direct contributions required by the Federal Insurance <br /> Compensation Act (FICA), Federal Unemployment Tax Act (FUTA), and State <br /> Unemployment Compensation Act(SUCA). <br /> 6.3.1.5 Small tool costs: 4%of Basic Wages in Clause 6.3.1.1 above. <br /> 6.3.2 Direct material costs. This is an itemization, including material invoice, of the quantity <br /> and cost of additional materials necessary to perform the change in the Work. These costs shall <br /> be by the unit cost applied to the quantity and extended. The unit cost shall not include discounts <br /> or rebates so long as Owner was given a reasonable opportunity and declined to provide payment <br /> qualifying for such discount or rebate.The material costs may include normal freight costs; Owner <br /> must pre-approve express charges or special delivery costs. <br /> 6.3.3 Construction equipment usage costs. This is an itemization of the actual length of time <br /> construction equipment other than small tools described in Clause 6.3.1.5 above, appropriate for <br /> the Work will be used solely on the change in the Work at the Site times the applicable rental cost <br /> as established by the lower of the prevailing rate published in The Rental Rate Blue Book by Data <br /> City of Everett—Contract Page 6 <br /> Between Owner and Design Builder—Lump Sum <br /> East Clearwell Roof Replacement Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.