My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5405 EAST DR 2020-05-18
>
Address Records
>
EAST DR
>
5405
>
5405 EAST DR 2020-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:09:58 AM
Creation date
5/18/2020 9:09:36 AM
Metadata
Fields
Template:
Address Document
Street Name
EAST DR
Street Number
5405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/31/2019 Page 1 <br /> City of Everett <br /> 8:49:09AM /, <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1802-016 Site Address 5405 EAST DR <br /> Applied 2/21/2018 Applicant Lot <br /> Approved 4/30/2018 Owner STREET SARAH E&JOSHUA G Block <br /> Issued 5/2/2018 Contractor OWNER Tract <br /> Parent Permit No. PW 1804-008 Description ACCESSORY DWELLING UNIT <br /> Notes PLMBG OTHER=WATER LINE FROM MAIN HOUSE TO ADU <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 7/3/2018 7/3/2018 BLDG DWF APPROVAL OK for concrete Note:Contractor install UFER ground. <br /> 02-FOOTING/SETB Verified setbacks. <br /> 7/3/2018 7/3/2018 BLDG DWF APPROVAL OK for concrete Note:Contractor install UFER ground. <br /> 03-FOUNDATION Verified setbacks. <br /> 7/3/2018 7/3/2018 BLDG 04-UFER DWF APPROVAL Note:Contractor install UFER ground. <br /> GROUND Verified setbacks. <br /> 7/5/2018 7/5/2018 BLDG DWF APPROVAL Subject to footing adding toe to center <br /> 02-FOOTING/SETB support foundation wall.Minimum 2"toe <br /> footings. <br /> Then OK to pour concrete.Will inpsect on <br /> under framing inspection. <br /> 7/13/2018 7/13/2018 PLUMB RRS APPROVAL Groundwork to be to <br /> 02-GROUND code <br /> 7/13/2018 7/13/2018 PLUMB RRS APPROVAL <br /> 03-ROUGH IN <br /> 7/18/2018 7/18/2018 BLDG DWF APPROVAL As noted Contractor to complete nailing straps before <br /> 07-EXTERIOR cover.No truss/rafter installed at this time. <br /> 1/30/2019 1/30/2019 PERMIT TKJ APPROVAL Extension to 6/14/19 <br /> EXTENSION <br /> 3/14/2019 3/14/2019 MECH 04-ROUGH SDP PARTIAL APPR eTRAKiT Inspection 3/13/2019 6:55 AM Josh Street <br /> IN Request <br /> Contact Name:Josh Street <br /> Site Address:5405 EAST DR <br /> Phone:2068503612 <br /> e-Mail:streetwise79@gmail.com <br /> (3/14/2019 1:44 PM SDP) <br /> Recall for stove and bathroom exhaust <br /> ducting.Dryer exhaust will be on the <br /> outside wall.Ok to proced with framing. <br /> Call when ready with the above items.Heat <br /> pump can not be in any setback. <br /> 3/14/2019 3/14/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 3/13/2019 6:55 AM Josh Street <br /> 08-FRAMING Request <br /> Contact Name:Josh Street <br /> Site Address:5405 EAST DR <br /> Phone:2068503612 <br /> e-Mail:streetwise79@gmail.com <br /> (3/14/2019 11:12 AM DWF) <br /> dwf changed Inspection Type from BLDG <br /> 10-INTERIOR SHEAR to BLDG <br /> 08-FRAMING <br /> INSP12 CRWsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.