My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1602 SE EVERETT MALL WAY DAYS INN 2020-05-18
>
Address Records
>
SE EVERETT MALL WAY
>
1602
>
DAYS INN
>
1602 SE EVERETT MALL WAY DAYS INN 2020-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 9:16:31 AM
Creation date
5/18/2020 9:16:27 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1602
Tenant Name
DAYS INN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PuBuc14614540§4ENT MAILED MAS COPY <br /> Utilities Division,3200 Cedar Street <br /> Ev Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $2371.00 Work Order# <br /> Cost of Service Order $.00 Service Order# <br /> Contact Person James Pontak Telephone# 206 295-4869 <br /> Requested By Kirk Brooks atDate of Re nest 11-10-2016 <br /> Property Owner(name) Anthem Self Storage LLC lea 5'.moi �� /4(7 71111 <br /> Charge Cost to(name if different than owner) <br /> Address 8115 Broadway#204 City Everett, WA Zip 98203 <br /> Installation Location 1602 SE Everett Mall Way <br /> Installation type/description/size/etc. Disconnect existing 6" main at"T" and reconnect to <br /> contractor installed 6". Cap/plug old 6". Contractor to ecxavate, shore and restore. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $145.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $1983.00 Matt Welborn <br /> Rental $130.00 Randy Allen <br /> Equipment Paul McKee <br /> Tax $113.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $2371.00 Benyam Stephanos <br /> Prepared by: Jim Spooner Date Estimate Prepared 11/10/2016 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\1610 SE Everett Mall Way 3 <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.