Laserfiche WebLink
COP11 <br /> ELECTRIC WEST, INC. <br /> CHANGE ORDER PROPOSAL <br /> GAPB <br /> ICI <br /> Additional Heat Trace to complete force main. <br /> Description: <br /> 1 DIRECT LABOR <br /> Job <br /> Classification Wage Rate Hours Cost <br /> Foreman 84.62 3.4 $287.71 <br /> JW 79.19 0 $0.00 <br /> Subtotal $287.71 <br /> Allowable mark up 29% $83.44 <br /> Total Labor Cost $371.14 <br /> 2 MATERIALS <br /> Description Quantity Units Unit Price Cost <br /> RAY-COM BOM 1 LS $2,440.23 $2,440.23 <br /> $0.00 <br /> $0.00 <br /> shipping 0 $0.00 $0.00 <br /> Use Tax 9.80% $239.14 <br /> Allowable mark up 21% $562.67 <br /> Total Material Cost $3,242.04 <br /> 3 EQUIPMENT Proposed <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Overhead&Profit 21% $0.00 <br /> Total Cost of Equipment $0.00 <br /> 4 SERVICES <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> Allowable mark up 21% $0.00 <br /> Total Cost of Services $0.00 <br /> 5 FORCE ACCOUNT MOBILIZATION $0.00 <br /> 6 SUBCONTRACTORS $0.00 <br /> 7 CONTRACTOR MARK UP ON SUBCONTRACTORS 12% $0.00 <br /> 8 ADDITIONAL CONTRACT DAYS REQUIRED 0 <br /> TOTAL COST OF PROPOSED CHANGE $3,613.18 <br /> Electric West reserves all contractual and legal rights to modify or supplement this Change Order to reflect <br /> additional cost or schedule impacts,and nothing herein shall be construed as a waiver of such rights. <br /> 3/2/2020 <br />