My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 4/28/2020 Change Order 22
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 4/28/2020 Change Order 22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 10:55:24 AM
Creation date
5/18/2020 10:54:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
4/28/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
22
Tracking Number
0000801
Total Compensation
$55,806.27
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Detail Report Page 3 <br /> Electric West, Inc. 4/2/2009:47 <br /> 4/2/2020 10 12.0.200228 <br /> Job: 442 Grand Ave Pedestrian Bridge Contract: 819,200.00 <br /> 1620 W. Marine View Dr.(West) Change Orders: 0.00 <br /> 1620 Grand Ave. (East) Revised: 819,200.00 <br /> Everett, WA 98201 Prey. Billed: 0.00 <br /> Open: 819,200.00 <br /> Contract Billings Cost Hours Date <br /> Cat. Description Date Invoice P.O. Amount To Date Actual Budget Overrun Actual Budget Over Quantity Bill a0 Posted Billing Cycle <br /> Phase: 99 - Change Orders <br /> 010 Utility Conduit FA <br /> L 12/30/2019 JYM Punch holes in jbox,insliall 185.80 1/400* 1/6/2020 <br /> hubs and measure nip <br /> Andy A Graves <br /> B 12/30/2019 JYM FICA,FUTA,SUTA,Workers Comp 27.40 1/6/2020 <br /> Andy A Graves <br /> L 1/3/2020 JYM Finished complete 165.80 4 0' 1/6/2020 <br /> Andy A Graves <br /> B 1/3/2020 JYM FICA,FUTA,SUTA,Workers Comp 27.40 1/6/2020 <br /> Andy A Graves <br /> L 3/23/2020 -mfiQR" Figure and material for new 51.10 3/30/2020 <br /> roof transition <br /> Andy A Graves <br /> B 3/23/2020 FOR FICA,FUTA,SUTA,Workers Comp 6.02 3/30/2020 <br /> Andy A Graves <br /> F Fringes 2,155.58 0.00 <br /> Category 010 Totals 0.00 6,846.34 0.00 6,846.34 91.50 0.00 91.50 <br /> Labor 4,141.91 4,141.91 91.50 91,50 <br /> Burden 548.85 548.85 <br /> Fringes 2,155.58 2,155.58 <br /> Phase 99 Totals 0.00 0.00 6,846.34 0.00 6,846.34 91.50 0.00 91.50 !' <br /> r <br /> Labor 4,141.91 4,141.91 91.50 91.50 <br /> Burden 548.85 548.85 <br /> Fringes 2,155.58 2,155.58 <br /> Job 442 Totals 0.00 0.00 6,846.34 0.00 6,846.34 91.50 0.00 91.50 <br /> Labor 4,141.91 4,141.91 91.50 91.50 <br /> Burden 548.85 548.85 <br /> Fringes 2,155.58 2,155.58 <br /> F, <br /> 011,2 \ore:, (,r? c <br /> Ales <br /> ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.