Laserfiche WebLink
Interwest Construction,Inc. <br /> Job Name: Everett Grand Ave Bridge Job Code: 1157 <br /> Cost Code Review <br /> Cost Code: 9115 12 In SSFM Fabrication Changes FA <br /> Code Description Class Reg.Hours OT Hours Other Hours <br /> Date: 11/19/2019 Foreman: HASTNATR Shift: 1 <br /> Time Card: <br /> Production Quantities: 0.000 <br /> HASTNATR Nathan R Hastings CF 1.50 0.00 0.00 <br /> 08-67 Dodge 1 Ton Quad Cab 1.50 0.00 0.00 <br /> WEITJOHR John R Weitzel CL 1.50 0.00 0.00 <br /> PECKPARS Parker S Peck CP 1.50 0.00 0.00 <br /> SCHUMICR Michael R Schumacher O1A 2.00 0.00 0.00 <br /> 26-04 Linkbelt 100RT 2.00 0.00 0.00 <br /> Labor Totals: Hours - 6.5 <br /> Equip Totals: Hours - 3.5 <br /> Cost Code Notes: <br /> Slot: 6 <br /> Company Note: Fit and tac pipe angles in correct orientation. <br /> Indexes: <br /> Inspector Note: <br /> Printed on: 03/31/2020 13:28:53 <br /> x Date: <br /> Attendance/Non-Use Codes included in Hours:None/None Page 1 <br />