My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1610 SE EVERETT MALL WAY 2020-05-18
>
Address Records
>
SE EVERETT MALL WAY
>
1610
>
1610 SE EVERETT MALL WAY 2020-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 1:23:13 PM
Creation date
5/18/2020 11:29:09 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14:1 PUBLICbRKS'DRENT MAILED MAS COPY <br /> Utilities Division,3200 Cedar Street <br /> Q/ Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> X Cost of Work Order $1680.00 Work Order# <br /> Cost of Service Order $.00 Service Order# <br /> Contact Person James Pontak .. Telephone# 206 295-4869 <br /> Requested By Kirk Brooks Date of Request 11-10-2016 <br /> Property Owner(name) Anthem Self Storage LLC !1/O S� �i�VP/1. A " VCM <br /> Charge Cost to(name if different than owner) <br /> Address 8115 Broadway#204 City Everett,WA Zip 98203 <br /> Installation Location 1605 SE Everett Mall Way Approx. 90' south of entrance to Bob's Bugers <br /> Installation type/description/size/etc. Connect contractor installed 8" D.I. to existing 8" valve <br /> on main. Contractor to ecxavate, shore and restore. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or.scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $226.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $1270.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $104.00 Paul McKee <br /> Tax $80.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $1680.00 Benyam Stephanos <br /> Prepared by: Jim Spooner C:yam Date Estimate Prepared 11/10/2016 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\1610 SE Everett Mall Way 5 <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.