Laserfiche WebLink
Subsurface Exploration, Geologic Hazard, and <br /> Krebs Property Preliminary Geotechnical Engineering Report <br /> Everett, Washington Geologic Hazards and Mitigations <br /> 5. If excavated soils are to be stockpiled on the site for reuse, measures should be taken to <br /> reduce the potential for erosion from the stockpile. These could include, but are not <br /> limited to, covering the pile with plastic sheeting and the use of straw bales/silt fences <br /> around pile perimeters. <br /> February 13, 2007 ASSOCIATED EARTH SCIENCES, INC. <br /> TJP/!d-KE070023A1-Projects120070023IKEIWP Page 7 <br />