My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Processing Group Inc. 5/4/2020
>
Contracts
>
Capital Contract
>
American Processing Group Inc. 5/4/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:51:15 AM
Creation date
5/18/2020 11:51:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Processing Group Inc.
Approval Date
5/4/2020
Council Approval Date
5/6/2020
Department
Public Works
Department Project Manager
Mike Robinson
Subject / Project Title
2019 Biosolids Removal Project
Public Works WO Number
UT3705 2
Tracking Number
0002315
Total Compensation
$594,938.12
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION CITY <br /> Project: 2019 Biosolids Removal&Disposal <br /> Contractor: American Processing Group Inc. <br /> Work Order No. UT 3705-2 <br /> The above mentioned project was constructed per the plans and specifications and to <br /> the satisfaction of the Public Works Department <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> —2e-20z0 <br /> Pu is Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> ____ l_ 7k_Zt9 <br /> Mayor, City o verett Date <br /> Cassie Franklin <br /> Atte : <br /> City Cler <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> 7G----1 K-rX( .1---1.1 -1-71 <br /> By: <br /> City Attorney Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.