My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1611 SE EVERETT MALL WAY 2020-05-18
>
Address Records
>
SE EVERETT MALL WAY
>
1611
>
1611 SE EVERETT MALL WAY 2020-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 1:25:31 PM
Creation date
5/18/2020 1:25:27 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1611
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#11Ai <br /> PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200.Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHFET <br /> Receipt # Date Paid <br /> X Cost of Work Order 571.00 Work Order# <br /> Cost of Service Order Service Order# <br /> Contact Person James Pontak Telephone# 206-295-4869 <br /> Requested By Gordon Witcher Date of Request 06-18-13 <br /> Property Owner(name) Anthem Self Storage LLC 1(1/0 Si �J(,,� G�, �1 ab� <br /> Charge Cost to(name if different than owner) <br /> Address 8115 Broadway Ave. 204 City Everett Zip 98203 <br /> Installation Location 1611 SE Everett Mall Way <br /> Installation type/description/size/etc. Cap/plug abandoned 6" and "T". Contractor to excavate, <br /> shore, and restore. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to'the person applying for the <br /> installation. <br /> 'Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material - cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits 458.00 Gordon Witcher <br /> Equipment Rental 105.00 Matt Welborn <br /> Mimice Ward <br /> Tax 8.00 Randy Allen <br /> TOTAL $571.00 <br /> Prepared by: Mike Ward //.7 LL)Date Estimate Prepared 06-18-13 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> e , <br /> S:\#Common\clerical\Cost.est\2012\1611 SE Everett Mall Way <br /> • <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.