Laserfiche WebLink
0 • <br /> 1. The following should be addressed for the fitness room: <br /> a. Two exits are required. The exits should be spaces at least%of the maximum room dimension apart. <br /> b. At least one designated egress route should be accessible. <br /> c. All doors in the exit path should open in the direction of egress travel. <br /> d. All exit doors in the egress path should be provided with panic hardware. This includes the west exterior <br /> gate if used as part of the egress route. <br /> e. The exits should be marked with signs and provided with emergency power. Additional exit signs should <br /> be provided to the discharge points. <br /> f. Emergency egress lighting should be provided with emergency power. Lighting should be provided to <br /> the discharge points. Exterior lighting should be provided at these points. <br /> g. Traversable paths should be provided from the discharge points to the public way or qualifying yard(s). <br /> h. The maximum occupancy should be posted by the primary exit. <br /> 2. The following comments should be addressed for the shower in Restroom#2 (Room 6): <br /> a. Verify the shower has the required accessible clearance. The dimension should be measured from the <br /> correct wall. <br /> b. Provide elevations showing the dimensions for the grab bars and seat. <br /> c. Provide blocking for the grab bars and seat. <br /> 3. The building includes multiple structural modifications, including new headers at the load-bearing wall at the <br /> east Fitness Room exterior wall, exterior wall infills, and closing the roof at the demolished chimney. Structural <br /> plans and details should be provided. <br /> 4. Infills for the roof and exterior walls should be insulated per the WSEC. <br /> 5. The project includes a detached structure (i.e.,the canopy west of the building). This may require its own <br /> building permit submittal. <br /> 6. Sheet G200 shows new accessible parking spaces. The minimum dimensions should be specified. Signs should <br /> be provided. At least one space should be designated as van accessible. <br /> 7. New Exterior Door 8 on the west side is required to provide an accessible exterior landing based on the <br /> minimum door clearances. <br /> Please let me know if you have questions. <br /> Drew Martin, P.E.,S.E. <br /> imaIII Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8813 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Hours: M/W/Th/F: 7:30am-12:00pm & 1:O0pm-3:00pm;Tu: 1:00pm-3:OOpm <br /> everettwa.gov I Facebook I Twitter <br /> COVID-19 Update: Please reference our website& online resources for updates to our service during the <br /> COVID-19 pandemic. We are currently experiencing a higher volume of calls and emails and have limited staff <br /> available to respond. Your patience is appreciated as we respond in the order received. <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> /6/ <br /> \__ <br />