|
w .
<br /> Watershed Flow Watershed Now
<br /> �Dwealbn L5ru6on� L
<br /> Watershed Fin Lo reel
<br /> Direction r n K Sly&gutter
<br /> ins. &roof / 1 mot 6m.� Ex root
<br /> Ox K'Slyk idler He. I 411, trod.
<br /> l tool Lce. Er K StHe gutter Ex K Slyk gutter per Section, Wuterwhed�Floe i�4dow�pout
<br /> • al nor We. at roar(. '6A/LI04' II
<br /> L Dow ut I Unction I Ex IC TDOMA9 RENGSTORF
<br /> New Downs ut l\ Downspout .. asps 4U IE t•I gutter at prof AND A96IX.TATE6
<br /> Ex&bony \w4 \\\i1• New docNage( , gutter
<br /> — dividers '9"fa gutkr.
<br /> Remove existing 1 1 New 4'TON pipe ,II , ddnoborge t bbsububbibbnis
<br /> mwx®,
<br /> Danepad,typ. Now/yurnnum doempeuL point.
<br /> Ex Downspout Teo'
<br /> Downspout 3'x4', to Downspout 3's4' Naw 6'a'Slyk „w„ea,urwweu. wa.nr
<br /> Downspout \ Ex Guardrail G Downspout Ex Ng AM
<br /> 9uWer of motconrcete b New N' a altarmeets to Y InstDo rwneL third Level C fit g 'Iumei t e. IM•1111111
<br /> IMol nnt bdcary. / YP l Ex K Sryk guDer Nm r, eyon Fx Guadmg IloeM9 0l edge
<br /> bP L / �� gullet,bryon4el root rub
<br /> Ledge —4.-., L DwnapoN 3w4.Iyp :b
<br /> Re-Locale.lyp.credible i to INO o dixhorDownspout Se4,hp. Ledge Jumper MoPased 0a 74 bypass: NH behind gNlerM A
<br /> Jumper 3x4, to the end.typ ' b hb end.tro. Jx4,typ, Fkxibk Obw-Conned to
<br /> NI, Downspout elbow. newt elbow, I new Downspout Bypass,typ.
<br /> typ- Er Downspout lyp. A�' Ner Awminum
<br /> Bwnspoul Y Ter Downspout Y \-G Downspout Ex Downspout 3'e4'
<br /> Downspout Funnel 3s4,ryp , Funnel 3o4.typ. l W I Bypass Downspout Downspout 3'r4', ..ie c u •
<br /> connects loge jumper, YPmyp.
<br /> ledge
<br /> jumper.lyp. Ex Cuadrdl VP. 11 3'x4'
<br /> fw Sermd Level ,,—NJ*K'Style gutter &Downspout Ex K Style gutter New.r, eyk
<br /> l bdcam/, eae.cl b Y gutter,beyond,.
<br /> connectsDownspout J /q'Tt funnel,yp. ;j .ibk Elbow TAT rcf ckv.x,
<br /> Y tunnel, Re-locale dkclwrW 'L A Downbeat strops: tYP.
<br /> ryp to this end,Np. 1 Downspout L4,IYP hP roper 'I additional length required
<br /> `Downspout elbow, Ex Downspout 3'0'
<br /> Ledge ,
<br /> ��
<br /> Jumper1i4. lNixill ByDownspoute DoeDownspout New Aluminum
<br /> Downspout TN', SILx'ERLAIKE
<br /> lyp Downspout Y Ex DoeinspoN 3%4' t1P. Downspout strap. I' APARTMENTS
<br /> Funnel 3e4,typ. cobble to DON Downspout 4,w
<br /> DON dowmpoN ledge*Per. i AdaptorUN
<br /> Downs conneauto adopter IP,typ lye. Flexible Dbae Two' OW Downspout Dewnepout
<br /> k * Wye adaptor tor ,Ebows Z. Rd Smion
<br /> P.P.;iv. DON straight pipe al IevN }' DWJ elmighl pipe , I 11 DWV straight pipe (� , 60/LI04' murr..„
<br /> ../ Wepnr 6'min,cover. •, ( - .. Dr'utro9ht pipe
<br /> fibbed grade depending on slope of OW!lee' Roof tr' +i_
<br /> DON lee' al pipe.Np. Roof Drain DW V pipe Roof Drain DIN pipe DON Tee' ' att.n,,,
<br /> Roof Drain DWu pipe OPTION'A' OPTION'B' Roof Drain DON DRAINAGE
<br /> (pie' ELEVATtONS G
<br /> 7• ELEVATION:TYPICAL BUILDING-REAR PATIOS-OPTION'B' 4A SECTION:TYPICAL BUILDING REAR PATIOS 4g SECTION:TYPICAL BUILDING REAR PATIOS ELEVATION:TYPICAL BUILDING ENTRY SECTIONS
<br /> ro w.ra
<br /> n
<br /> A
<br /> Li
<br /> A
<br /> Permabc Edging: Secant least a
<br /> Cbonline XL IT, Ex Overhmrq—
<br /> Nth Face, NowX Co''Style Cutter Soil Replacement Area: A •
<br /> StepSteppinglyp.p Slone lyp• (S)k Downspout `-1 1. Imported topsoil(6'depth>Cedar Grove Q
<br /> Wo&,typ. Clan r arched Fnehcd (3'141 fa artdvnq. together too a depth of 6';sub-grade
<br /> Rough anode ores: o -
<br /> Asphalt Curb, aggregate,4'D, Spa Wily Meter Raw. II
<br /> Add 4'imported topsoil @ finegrade area,
<br /> TIP. IY0. Caner a hurling .I uBlarmN tromitioning into existing soil/lW T Ex �n,e.,,
<br /> area;Add sod la fine graded ado.
<br /> Now Downspout 3'a4' ' Finlhed grade
<br /> New 9'N06 CB ' Heinlein 6'min.abovefyav ImpoNd topsoil
<br /> Fmk *Alter insert. m I/; fnleAed de.IYP• de N,(YP Reducer bush' 9ro P
<br /> mono wi
<br /> Walk.yp IyD. ' ',tyD. DMV'Elan 'N• Maintain 6 Amin.cover. Rolo-filed ;��i;Ji• o
<br /> TO PVC OWN a Tee' 0009depb p ebbs o/ Sub-gale(8'j,ND. -ii=i \�_�_�`_�=_i=/ii=i`� MOM 11
<br /> .
<br /> pPe.yp
<br /> enrol pipe.lyp. Undisturbed wV. _
<br /> yp COD
<br /> ®SECTION:TYPICAL BLDG FRONT ENTRY O SECTION:BLDG'A'-UTILITY OVERHANG ,�O SECTION:SOIL REPLACEMENT Ploict a veuma M.
<br /> ve•rc w.ra ua-ro
<br /> O DRAINAGE ELEVATIONS&SECTIONS L 1 .05
<br /> NOT TO SCALE
<br /> Z
<br /> a 10' XI' 40'
<br />
|