Laserfiche WebLink
Stormwater Site Plan January.9, 2018 <br /> Catholic Housing Services—Everett Safe Streets Supportive Housing <br /> PRE POST <br /> (cfs) (cfs) <br /> 2-year 0.02506 0.02204 <br /> 50-year 0.08904 0.06206 <br /> 100-year 0.09649 0.07668 <br /> Table 1:Runoff Flow Results <br /> D. Stormwater Flow Control Plan <br /> Post-developed runoff was mitigated to be less than pre-development conditions for 50%of the pre- <br /> developed 2-year through the 50-year runoff as per Minimum Requirement#7 from the DOE. The <br /> proximity of the Landslide Hazard Critical Area does not allow for the application of most of the <br /> traditional best management practices(BMPs)to be within a 200-foot buffer. <br /> An underground detention vault is proposed beneath the parking lot constructed of precast concrete <br /> sections, 100 ft long,38 ft wide,and 5.5 ft deep,with an invert of 410.0. This provides just over 0.4 <br /> acre-feet of storage,and receives runoff collected from the roof and proposed parking lot,after first <br /> being run through the bio-retention cell located near the south end of the parking lot. Any Emergency <br /> overflow of the detention will be directed to Berkshire Drive curb and gutter. The detention facility shall <br /> be constructed as shown in the site plan details(Appendix A),with and internal flow restrictor assembly <br /> at the downstream end. <br /> The detention vault shall have a standard flow control restrictor outlet structure as shown in COE <br /> standard drawings 415. The restrictor assembly shall consist of an 18-inch vertical pipe,open at the top, <br /> and with a 0.5-inch diameter orifice at invert 410.50,and additional 0.85-inch orifice with invert 413.50. <br /> Effluent will be discharged into the 12-inch storm drain pipe along Berkshire drive. <br /> All proposed pipes are Corrugated Polyethylene Pipe(CPEP).A roughness coefficient of 0.014 was used <br /> in the design of all pipe sizes to ensure the 2 foot per second minimum velocity.A minimum slope of 1.5 <br /> percent for 6 pipes,and 1 percent for 8 and 12 inch pipe was used.Table 2 below,shows pipe capacities, <br /> and the highest 25-yr peak flow(computed using Rational Method)expected on site.All pipe crowns are <br /> more than 1 ft below adjacent manhole covers and/or grates and are not expected to run full,thus HGL5 <br /> should be low enough to prevent any overflow of the system. <br /> Rational Method parameters were chosen using the COE DCSS,Section 4-3.1(1). Runoff coefficients <br /> were averaged using area weighting per drainage sub-basin. Coefficients used from COE Table 4-3.1(1)-2 <br /> were 0.90 for roofs and pavement,and 0.25 for lawns.The time of concentration was assumed at a <br /> minimum of 6 minutes(NRCS,TR-55)to compute a conservative rainfall intensity. <br /> Composite Intensity Area Q25 Pipe Min. Manning's Velocity Capacity <br /> C (in/hr) (ac) (cfs) Dia. Slope 'n' (fps) (cfs) Notes <br /> (in) (%) <br /> Entire Roof 0.90 2.76 0.254 0.631 6 1.5 0.014 3.26 0.640 West <br /> Tight-Line <br /> "To Detention" West Storm <br /> 0.60 2.76 0.659 1.097 8 1.0 0.014 3.23 1.140 <br /> Drainage Area Drain Pipes <br /> North Yard 0.33 2.76 0.081 0.074 8 0.9 0.014 3.07 1.082 East Storm <br /> Drain Pipes <br /> Table 2:Rational Method and Pipe Capacities <br /> 7IPage <br />