My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6200 12TH DR SE Geotech Report 2022-10-25
>
Address Records
>
12TH DR SE
>
6200
>
Geotech Report
>
6200 12TH DR SE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:24:38 PM
Creation date
5/19/2020 9:18:22 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH DR SE
Street Number
6200
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Catholic Housing Services JN 16298 <br /> November 1, 2016 Page 9 <br /> essentially destroying the purpose of the vapor barrier/retarder. Therefore, if there is a potential <br /> that the protection/blotter material will become wet before the slab is installed, ACI now <br /> recommends that no protection/blotter material be used. However, ACI then recommends that, <br /> because there is a potential for slab curl due to the loss of the blotter material, joint spacing in the <br /> slab be reduced, a low shrinkage concrete mixture be used, and "other measures" (steel <br /> reinforcing, etc.) be used. ASTM E-1643-98 "Standard Practice for Installation of Water Vapor <br /> Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs" generally agrees with <br /> the recent ACI literature. <br /> We recommend that the contractor, the project materials engineer, and the owner discuss these <br /> issues and review recent ACI literature and ASTM E-1643 for installation guidelines and guidance <br /> on the use of the protection/blotter material. <br /> The General, Permanent Foundation and Retaining Walls, and Drainage Considerations <br /> sections should be reviewed for additional recommendations related to the control of groundwater <br /> and excess water vapor for the anticipated construction. <br /> EXCAVATIONS AND SLOPES <br /> No excavated slopes are anticipated other than for utility trenches. Excavation slopes should not <br /> exceed the limits specified in local, state, and national government safety regulations. Temporary <br /> cuts to a depth of about 4 feet may be attempted vertically in unsaturated soil, if there are no <br /> indications of slope instability. However, vertical cuts should not be made near property <br /> boundaries, or existing utilities and structures. Based upon Washington Administrative Code <br /> (WAC) 296, Part N, the soil at the subject site would generally be classified as Type B. Therefore, <br /> temporary cut slopes greater than 4 feet in height should not be excavated at an inclination steeper <br /> than 1:1 (Horizontal:Vertical), extending continuously between the top and the bottom of a cut. <br /> The above-recommended temporary slope inclination is based on the conditions exposed in our <br /> explorations, and on what has been successful at other sites with similar soil conditions. It is <br /> possible that variations in soil and groundwater conditions will require modifications to the <br /> inclination at which temporary slopes can stand. Temporary cuts are those that will remain <br /> unsupported for a relatively short duration to allow for the construction of foundations, retaining <br /> walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet <br /> weather. It is also important that surface runoff be directed away from the top of temporary slope <br /> cuts. Cut slopes should also be backfilled or retained as soon as possible to reduce the potential <br /> for instability. Please note that loose soil can cave suddenly and without warning. Excavation, <br /> foundation, and utility contractors should be made especially aware of this potential danger. These <br /> 111 recommendations may need to be modified if the area near the potential cuts has been disturbed in <br /> the past by utility installation, or if settlement-sensitive utilities are located nearby. <br /> Water should not be allowed to flow uncontrolled over the top of any temporary or permanent <br /> slope. All permanently exposed slopes should be seeded with an appropriate species of vegetation <br /> to reduce erosion and improve the stability of the surficial layer of soil. <br /> Any disturbance to the existing slope outside of the building limits may reduce the stability of the <br /> western slope. Soil from the excavation should not be placed on the slope. <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.