My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/04/29 Council Minutes
>
Council Minutes
>
2020/04/29 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 9:57:56 AM
Creation date
5/20/2020 9:57:49 AM
Metadata
Fields
Template:
Council Minutes
Date
4/29/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> April 29, 2020 <br /> RESOLUTION - CLAIMS <br /> To adopt Resolution No. 7505 authorizing claims against the City of Everett in <br /> the amount of$4,117,419.67 for the period of April 11, 2020, through April 17, <br /> 2020. <br /> RESOLUTION - CLAIMS <br /> Adopt Resolution No. 7506 authorizing payroll claims against the City of Everett <br /> in the amount of$4,059,075.58 for the period ending April 11, 2020. <br /> JOB COMPLETE—SOUTH PRECINCT ROOF REPLACEMENT <br /> To accept the construction of the South Precinct Roof Replacement as complete, <br /> and authorize the Mayor to sign the Certificate of Completion with Snyder <br /> Roofing of Washington, LLC in the amount of$449,242.31. <br /> • AGREEMENT—GROUNDWATER LEVEL MONITORING <br /> To authorize the Mayor to sign the easement agreement to the Washington <br /> State Department of Ecology for access to an existing City well for groundwater <br /> level monitoring. <br /> AGREEMENT AMENDED- DIVERSION DAM ROAD PHASE 3 PROJECT <br /> To authorize the Mayor to sign Change Order No. 2 to the contract with Weber <br /> Construction, Inc.for the Diversion Dam Road Phase 3 Project in the amount of <br /> $208,394.12. <br /> AGREEMENT AMENDED- PROCESS WATER PUMP STATION <br /> To authorize the Mayor to sign Change Order No. 3 to the construction contract <br /> with Stellar J Corporation for the Process Water Pump Station in the amount of <br /> $12,572 and the addition of 298 calendar days. <br /> • <br /> 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.