My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815 SHORE AVE 2020-05-20
>
Address Records
>
SHORE AVE
>
3815
>
3815 SHORE AVE 2020-05-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 3:41:30 PM
Creation date
5/20/2020 3:38:43 PM
Metadata
Fields
Template:
Address Document
Street Name
SHORE AVE
Street Number
3815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/13/2019 'age 1 <br /> City of Everett <br /> 11:28:08AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C l803-003 Site Address 3815 SHORE AVE <br /> Applied 3/6/2018 Applicant KENNEDY JOHN&DANYEL Lot <br /> Approved 5/9/2018 Owner KENNEDY JOHN&DANYEL Block <br /> Issued 5/10/2018 Contractor OWNER Tract <br /> Parent Permit No. PW 1803-016 Description NEW SFR(REPLACES EXISTING SFR) <br /> Notes (6/4/2018 7:50 AM TKJ) <br /> PLAN REVISED TO ADD 2114 SQ FT OF UNF BASEMENT <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 6/7/2018 6/7/2018 BLDG KMK APPROVAL <br /> 02-FOOTING/SETB <br /> 6/7/2018 6/7/2018 BLDG 04-UFER KMK APPROVAL <br /> GROUND <br /> 6/19/2018 6/19/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 7/5/2018 7/5/2018 BLDG DWF APPROVAL R-10 rigid foam.OK 7/4/2018 5:43 AM John Kennedy <br /> 06-UNDERSLAB for concrete concrete pour scheduled for LOAM <br /> Contact Name:John Kennedy <br /> Site Address:3815 SHORE AVE <br /> Phone:2067935520 <br /> e-Mail:jkennedy@newwestsite.com <br /> 8/23/2018 8/23/2018 BLDG DWF PARTIAL APPR OK to cover(siding). <br /> 07-EXTERIOR <br /> 8/29/2018 8/29/2018 BLDG DWF OTHER For holes,cut in beams to be <br /> 08-FRAMING 6"x20"kitchen <br /> 6"x12"elevator <br /> 6"x28"garage <br /> Need engineer approval letter. <br /> 10/16/2018 10/16/2018 MECH 04-ROUGH SDP PARTIAL APPR 1.Complete fireplace venting through roof. <br /> IN 2.Complete draft stopping and <br /> boxing/insulation shields of fireplace <br /> venting. <br /> 3.OK to continue with framing but please <br /> DO NOT drywall until mechanical is signed <br /> off. <br /> 10/16/2018 10/16/2018 BLDG DWF CORRECTION Not ready <br /> 08-FRAMING <br /> 10/26/2018 10/26/2018 BLDG DWF CORRECTION Top plate,cut outs over 50%need seismic <br /> 08-FRAMING straps.#1 on main floor. <br /> Note:Received arch/eng letter for hoels in <br /> beams- Letter OK <br /> 10/26/2018 10/26/2018 BLDG DWF CORRECTION Wall(SW7)not on <br /> 10-INTERIOR shear schedule <br /> 10/31/2018 10/31/2018 BLDG KMK PARTIAL APPR Insulation OK <br /> 11-INSULATION 1.Please complete mechanical corrections <br /> and inspection before cover. <br /> 2.Complete framing for B-vent prior to <br /> mechanical inspection. <br /> 10/3.1/2018 , 10/31/2018 MECH 04-ROUGH SDP CORRECTION DO NOT 1.You must complete the framing around <br /> IN DRYWALL-See the fireplace vent pipes so the inspector can <br /> notes verify the clearances. <br /> 2.You must install blocking in the main <br /> floor and basement floor/ceiling space to <br /> maintain the required air space. <br /> 3.Roof penetrations of vents not complete <br /> for fireplaces. <br /> 10/31/2018 10/31/2018 MECH 04-ROUGH SDP APPROVAL As noted 1.Contractor/owner will extend framing <br /> IN around the fireplace as discussed with a <br /> minimum 1"cleance. <br /> 2.Vent terminations for fireplaces will look <br /> at on final. <br /> 11/5/2018 11/5/2018 BLDG DWF APPROVAL <br /> 09-DRYWALL <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.