Laserfiche WebLink
- 'Par <br /> Tii <br /> `çIaIIl <br /> or HardiePanel" Vertical Siding <br /> ,ir SINGLE FAMILY INSTALLATION REQUIREMENTS <br /> .ffiii5. co <br /> EFFECTIVE APRIL 2018 <br /> IMPORTANT:FAILURE TO FOLLOW JAMES HARDIE WRITTEN INSTALLATION INSTRUCTIONS AND COMPLY WITH APPLICABLE BUILDING CODES MAY VIOLATE LOCAL LAWS,AFFECT <br /> BUILDING ENVELOPE PERFORMANCE AND MAY AFFECT WARRANTY COVERAGE.FAILURE TO COMPLY WITH ALL HEALTH AND SAFETY REGULATIONS WHEN CUTTING AND INSTALLING <br /> THIS PRODUCT MAY RESULT IN PERSONAL INJURY.BEFORE INSTALLATION,CONFIRM YOU ARE USING THE CORRECT HARDIEZONE®PRODUCT INSTRUCTIONS BY VISITING <br /> HARDIEZONE.COM OR CALL 1-866-942-7343(866-9-HARDIE) <br /> © CUTTING INSTRUCTIONS <br /> STORAGE&HANDLING: OUTDOORS INDOORS <br /> 1.Position cutting station so that airflow blows dust away from the DO NOT grind or cut with a power saw indoors.Cut using shears(manual,pneumatic or <br /> Store flat and keep dry and covered prior to user and others near the cutting area. electric)or the score and snap method,not recommended for products thicker than 7/16 in. <br /> installation.Installing siding wet or saturated may 2.Cut using one of the following methods: <br /> result in shrinkage at butt joints.Carry planks on a.Best Circular saw equipped with a HardieBlade®saw blade <br /> and attached vacuum dust collection system.Shears - DO NOT dry sweep dust;use wet dust suppression or vacuum to collect dust. <br /> edge. Protect edges and corners from breakage. (manual,pneumatic or electric)may also be used,not - For maximum dust reduction,James Hardie recommends using the"Best"cutting <br /> James Hardie is not responsible for damage caused recommended for products thicker than 7/16 in. <br /> p 9 practices.Always follow the equipment manufacturer's instructions for proper operation. <br /> by improper storage and b.Better: Circular saw equipped with a dust collection feature - <br /> (e.g.Roan®saw)and a HardieBlade saw blade. For best performance when cutting with a circular saw,James Hardie recommends handling of the c.Good: Circular saw equipped with a HardieBlade saw blade. using HardieBlade®saw blades. <br /> product. .% - Go to jameshardiepros.com for additional cutting and dust control recommendations. <br /> IMPORTANT:The Occupational Safety and Health Administration(OSHA)regulates workplace exposure to silica dust. For construction sites,OSHA has deemed <br /> that cutting fiber cement with a circular saw having a blade diameter less than 8 inches and connected to a commercially available dust collection system per <br /> manufacturer's instructions results in exposures below the OSHA Permissible Exposure Limit(PEL)for respirable crystalline silica,without the need for additional <br /> respiratory protection. <br /> If you are unsure about how to comply with OSHA silica dust regulations,consult a qualified industrial hygienist or safety professional,or contact your James <br /> Hardie technical sales representative for assistance.James Hardie makes no representation or warranty that adopting a particular cutting practice will assure <br /> your compliance with OSHA rules or other applicable laws and safety requirements. <br /> GENERAL REQUIREMENTS: INSTALLATION: <br /> • These instructions to be used for single family installations only.**For Commercial/Multi-Family installation Fastener Positioning <br /> requirements go to www.JamesHardieCommercial.com Position fasteners 3/8"from panel edges and no closer <br /> - • HardiePanel®vertical siding can be installed over braced wood or steel studs,20 gauge(33 mils)minimum to than 2in away from corners.Do not nail into corners. <br /> 16 gauge(54 mils)maximum,spaced a maximum of 24 in o.c.or directly to minimum 7/16 in thick OSB HardiePanel Vertical Siding Installation <br /> sheathing.See General Fastening Requirements.Irregularities in framing and sheathing can mirror through •Framing must be provided at horizontal and vertical <br /> the finished application.Correct irregularities before installing siding. edges for nailing. <br /> • Information on installing James Hardie products over non-nailable substrates(ex:gypsum,foam,etc.)can be •HardiePanel vertical siding must be joined on stud. <br /> located in JH Tech Bulletin 19 at www.jamehardie.com •Double stud may be required to maintain minimum <br /> • A water-resistive barrier is required in accordance with local building code requirements.The water-resistive edge nailing distances. <br /> barrier must be appropriately installed with penetration and junction flashing in accordance with local building <br /> code requirements.James Hardie will assume no responsibility for water infiltration.James Hardie does Joint Treatment <br /> manufacture HardieWrap®Weather Barrier,a non-woven non-perforated housewrapt,which complies with •Vertical Joints-Install panels in moderate contact(fig.1), <br /> • building code requirements. alternatively joints may also be covered with battens, <br /> When installing James Hardie products all clearance details in figs.3 thru 14 must be followed. <br /> • Adjacent finished grade must slope away from the building in accordance with local building codes-typically PVC or metal jointers or caulked (Not applicable to <br /> a minimum of 6 in.in the first 10 ft. ColorPlus® Finish)(fig.2). <br /> • Do not use HardiePanel lap siding in Fascia or Trim applications. •Horizontal Joints-Provide Z-flashing at all horizontal <br /> • Do not install James Hardie products,such that they may remain in contact with standing water. joints(fig.3). <br /> • HardiePanel vertical siding may be installed on flat vertical wall applications only. Figure 3 <br /> • DO NOT use stain,oil/alkyd base paint,or powder coating on James Hardie®Products. <br /> • For larger projects,includingcommercial and multi-family projects,where the span of the wall is significant in ° water-resistiveriewater-resistive <br /> 9 Y P 9 �,-- barrier barrier <br /> length,the designer and/or architect should take into consideration the coefficient of thermal expansion and I .4--upper panel —upper panel <br /> moisture movement of the product in their design.These values can be found in the Technical Bulletin Do not 1/4"gap Do not 1/4"gap <br /> "Expansion Characteristics of James Hardie®Siding Products"at www.jameshardie.com. 'I_ Caulk ,l, Caulk <br /> I • James Hardie Building Products provides installation/wind load information for buildings with a maximum mean �'rt 4,-**"roof height of 85 feet.For information on installations above 60 feet,please contact JH technical support. '." Z-flashing ~Z-flashing <br /> I <br /> decorative <br /> Figure 1 band board <br /> g ►� -,- -- '� sheathing (Caulking Joints is applicable to 4--lower <br /> i� g Figure 2 ColorP1vn Finish) panel lower <br /> HardiePanel water-resistive <br /> Batten Joint "H"Joint Caulk Joint ~panel <br /> °Hardieverticaanelsldlnbarrier water-resistive burner water-resistive barrier water-resistive barrier Figure 4 <br /> Keep nails I `=4 stud _ 2 x 4 stud 2 x 4 stud g <br /> from panel 111 r ,t �- pill <br /> Recommendation:When <br /> edges L <br /> Installing Sierra 8,provide <br /> , <br /> t <br /> � §li <br /> SI� a double stud at panel <br /> joints to avoid nailing <br /> moderate contact through grooves. <br /> Keep fasteners 2in leave appropriate gap between <br /> away from comers panels,then caulM ®® /�/—) <br /> Apply caulk In accordance with caulk manufacturer's mitten application the Herons. JamesHardie �4V <br /> James Hardie recommends installing a rainscreen(an air gap)between the HardiePanel siding and the water-resistive banter as a best practice. .7•e �r <br /> James Hardie recommends that you consult your design professional if you have questions regarding the use of rainscreen on your single famiN project. <br /> 'For additional Information on HardleWrarii.Weather Barrier,consult James Hardie at 1-866-4Hardie or www.hardiewrap.com <br /> SMOOTH I CEDARMILL® I STUCCO I SIERRA 8 i <br /> Visit jameshardiepros.com for the most recent version. HS1237 P1/3 04/18 <br />