Laserfiche WebLink
WEST �— 9540 Semiai7moosParkway (425}347-8898: <br /> STRUC �} � _, <br /> sTRUCTURAL�� ° 4 #t37wcse.ner <br /> ENGINEERING,INC. I Blaine,WA 98230 <br /> 1 <br /> [ 1 <br /> I <br /> 1 <br /> i 81 ___, B1 <br /> 11010 <br /> Roof Framing Plan <br /> NTS <br /> Beam: Garage Door Header-Si uniform Loads r w <, ,F 4 v oft) Point'l nitude(k) <br /> Span: 1�0 ft start end (ft) start end (pf) distance(ft) i <br /> 0 13 6r2—0 6201 i <br /> Member: 3 1/8"x 9"24F V4 GIB f <br /> Epsi 1..f E4.06 x= 5 (ft) <br /> finM 193 MOx= 7_75 (k-ft)3 <br /> Ain2 28.1 V 7 x= 0 (k) j <br /> Results L I a <br /> M allow= 8.40 (k-ft) 3000 Loading Diagram:Garage Door Header 1 <br /> M max = 7.75 (k-ft) 1. 0,$ <br /> 2000{ <br /> TM <br /> ca <br /> R2= 3.10 (k) 2 1090, 0,4 <br /> z 0.2 Q. <br /> v max = 165 (psi) o . _ _ _ _ _ _ 0 <br /> Deflect.= 0.409 ;(in) a 1 2 3 4 °5 /6 T 8 9 10 <br /> = L <br /> 294 . <br /> Project: W4484 Sheet No: 2 6/8/2018 <br />