Laserfiche WebLink
0.Joists to be anchored to masonry walls with tOga.X 1-1/2"x 10" STRUCTURAL NOTES <br /> steel anchors(with 2"books)@4'-0"o.c.max.Nail to joists or <br /> RLOO -DR blocking with 8-104 nails. Construction to meet International Building Code 2012/fEke. <br /> � Pr rt_0OR.JOISTS 6.Spike all laminated members together with 10d nails @12"o.c. <br /> staggered.Splice laminations at supports only. A.Live Loads <br /> _ 7.Laminate two full-height studs to cripples under headers and block Roof/Snow Load-25psf <br /> ' pOOF SUEATIm•G -_.-_ -- - -- _-. _- solid to bearing. Wind-110MPH.Exp."B" <br /> .o a UAN. 8.Provide out washers for a6 bolts bearing on wood. Seismic-Category D. <br /> 9.All nails should be common"ire nails. <br /> VENT BLODK+p .1 r '�'n_ "'�m�' 10 Ci e-laminated timbers,Douglas Fir,A1TC-grading:combination il.Soil and Foundation Data <br /> ,` a® 24F-V4 for simple spans;24F-V8' for cantilevered spans.Dry <br /> DRP condition of use. 1.Design bearing strength 200psf.Coefficient of friction 025.Passive <br /> _ ASA>tiIST 9MPSON LSTA11 Architectural Appearance grade where exposed to view. resistance=300 pct. <br /> soy FOR N-I ���; w013'5 PER ROOF 9Hco 2.0 G OR EWAL Fabricating plant RITC inspected.W cofp individual members. 2.Carry all footings down to undisturbed soil,minimum depth=t'-6^ <br /> •24'oc 4 e„yjEApaN.LL SGHEDIILE .e.•oc UAN. SHEAR WALL <br /> Ass PER LOLLERILENEL 8NE4FaLU'LL PER PLAT+ not Submit shop drawings Cor review prior 400 psition.1655 iv.wide unless noted. <br /> f.1gARalALL TAEILE RI !: , .. ._..._.. . portion- _ �' -1 P•' C.Concrete <br /> tl shall be industrial grade.(FB=< W i•Fv 5 i• <br /> LAPPS'1 NOT, .,,.,„. UP PLATE NAILING PER -____..__.. 1A E-.8x10 6 pat;C 65Up t). <br /> al <br /> ON R1M JD•BT 1 s <br /> LAPPED I 11PPER LEVEL EHECi 7.-L L- 1.to re-steel as shown in ACl Manual of <br /> OR cc*ssO^I PLATE• • LAP E F s%+--ATN01 11.Plywood:Roof..24/sheathing se be 15/32"one INT-APA plywood with <br /> 1,,,,,,,,•,• ,,�-,t LAPPED GJ Rp4•JOIST OR @,p �j !A exterior glhe,Y.L 2410(Use 5-ply for panelized roofs).NailingDetail,fabricate,and place <br /> ,I�. eGTs'ION PLATE ��/",�`i��0'U'�! ®�0 W ed@ 6"o.c.at panel edges,8d@10"o.o.at intermediate supports. Standard Practice"ACI 315. <br /> 4 GABLE <br /> I Ra't JplsT OR t'AKG END 1�• 2.Concrete of following 28 day test strength. <br /> ^�. Oriented Stena board of equal rtrevgtb may be substituted fora.f=3WU psi,5-1/2 sack cement per cubic yard,(no testing <br /> _". ad A•c'o� =/v'r'-o" plywood. <br /> �� required) <br /> fSNEppATE PER PLAN - --- ROOF DR' 12.Pre-fabricated members to be designed by Washington State q ) <br /> LE L I Iw, BtJdG� licensed structural engineer and in accordance with requirements b.Precast walls P=3000 psi. <br /> st4g <br /> ASE PER LdJIER IP6EdR -4 �TABLE A35• - -LSrA t8-� TRUEStun. drawingsengineer's seal for _ <br /> 4pUALL TABLE FLOOR JOISTSc. Maximum Slump 4" <br /> 0 <br /> a shown.Submit complete shop withd.Reinforcing fy 40,000 psi. <br /> Ibd TN•tz'oc <br /> 5-BATWING NOT i I is st✓Ep,TURY,NOT reuse prior to fabrication. 3 C <br /> LAPPED ON PPI JO BT LAPPED OH RimPL pIST D4� I __- <br /> w rt <br /> �,, , over(Clear Dimensions).IIs 1-1/2". <br /> OR CO MON � ' ow COMMON - .---- <br /> -,.. _,- - 71.' •�� a.Exteriorf ccs of wah2^. <br /> ilia:.-.,, RIM JOIST OR BLK'G ��I� � <br /> EDGE NAILIKa ' p�7g II li BtruMural Sted b.Vertical faces exposed to ear( <br /> PER DULE5HEAALL e•Beaute of elevated slats ea clear. <br /> SOHEDUASHEARWAN �_ ,�,�,.�. 4.La ail field splices 30 diameters.Bend wall and footing bars 18" <br /> ad TN•s'x LSTA 24 1.All steel except tubing:ASTM A-36. P P <br /> ' • �-ANCNOR BOLTS PER PLAN Pipe:ASTM A-53,type E or S,grade 40.Tubular section:ASTM around <br /> ..• PER pLy,l • BLOCKII4 C' 1I A500,Grade B.All bolts:ASTM A-307/ASTM A-325,type X. all corners,or use corner bars. <br /> I <br /> 'O 1}1MPSON A24 <br /> GABLE ENS 3 1QQQ1RRRR EOU 2.All ion ofatiov,erection aed ons iruct in accordance with the latest 5.Dowel all exterior projections to structure with N4 bars at 12" <br /> IMO <br /> ER DETAIL SHEAR WALL edition of Steel <br /> re of Steel Construction"of the American hooked iota wall. <br /> SHEAR T-. . -._ <br /> ----- Institute of Steel Construction. 6.Place no backfill against foundation walls until floors are in place. <br /> SDIST '2 3 WALL 3.All welding by WABO certified welders in accordance with" 7.Incorporate to calcium chloride admixtures where aluminum alloy <br /> 'BLOCK.27067 \ materials are embedded. <br /> SPACE. Welding Handbook"by tine American Welding Society. <br /> F h l U N G ®IS II M n to 4.All weldsbe 3/16"minim➢m continuous fillet welds using ASW' 8-All wood forms used for concrete in the grounder between <br /> LAS,E7OXXX electrodes. foundation sills and the ground shall be removed. <br /> Cg <br /> D.Excavating and fill <br /> r HEADER PER PLAN. �!� 3/4"- t'-0" 5.Field burning of boles is not allowed without inspection by <br /> • gd"3'OD ETD EMEND?O END OE PANEL _- _-__ __ _ -._ _._- engineer. I.Excavation and fill shall generally conform to IBC 2012 Chapter <br /> _ 6.Provide washers on bolted connections. ISA <br /> • <br /> 7.All steel not embedded in concrete or masonry to receive one shop and Appendix J IBC 2012. <br /> . - - coat of an approved primer paint.Apply two coats of heavy 2.Foundation,wall,and slat areas shah have all existing unsuitable <br /> �i'Ifi�IIA■eat afuER S DE iF E PLSTD NOT asphaltic paint to all steel exposed to earth. Ffillo materials removed and disposed of off-site,and be excavated <br /> ry Rotas waw siNKERS a 3` i OTHER EIDE END STUD _.- _. 8.Submit complete shop drawings for review prior to fabrication.panel materialtemaybe usedtive soilby Engineer or <br /> i! down suiundisturbed <br /> • <br /> .>0'APART -.-_.-____.-.---- 9 p downth for fill <br /> - __ _ .Metal roof deck fabricator to submit shop drawings showing Excavatedif approved En me <br /> FULL <br /> Geotee <br /> 3'oe <br /> BREAK sHEATHNG wRHM layout,welding pattens at supports,perimeter and side laps.ta•OF MIC-N'cIGHT!IF -um'APA RATED SHEATN e° - <br /> �� RILL MIGHT FROM SILL PL � �"�� - Provide steel headers at all openings thought the deck to <br /> NECESSARY).(2)CSE 3w . TO TOP OF ItDR Ll/0d.3'oc satisfactorily distribute the load to xupPortivg members. <br /> BLKG OR(2)2z NAILED _ 4LL 5ND9 AND PLATES' atCu<wer_p➢,ptµ E.Wood Roof Trusses <br /> TOGETF 40 W'Ind•3'oc ti.o oc FIELD NAasYa. is 'x1°Nm I IU.Expansion anchor installation per ICBG report No.ers. 1. <br /> _ Siamese Epoxy grouted bolts per ER-4945. Shah r with t fabricated trusses.Design and fabrication shall <br /> TO BLOC.AS <br /> li. 1' <br /> z-zw sTues ■III■I-I-I■I mer wnwm conform with the requirements of the International Budding Code <br /> ,we -1 and Design Specifications for Light Design Plate Connected Wood <br /> SINDN STRAP `41111ttxq..P_-°TE • Anchor Bolts for foundation only. Trusses published by the Truss Plate Institute. <br /> NOLDdtr,t a•OONO sou smr. • 3"sq.washers,gaWanized. Engineering design and shop drawings bearing the scamp of a <br /> � _ u'z • .82 koef.For11FM membersprofessional engineer registeredin the Stole ofWashingto➢and <br /> VIIIA( 9 T'ooeo 3x members for stearwalls>390H/R. howingalldetailsofonstructionrequiredfuracomplete`� �tttt�ttt� wrroow Installnriou shell be submitted to the Architect forreview.(zJ v2'Ary-I-lo¢ I', h:' I7'r1' I ! -BOLTS 1 �.� -J �• Handers 2-2x6 Hp.interior bearing walls for DFH2 G]'-0" <br /> - 1111 <br /> ��I' 3-2xer22x8typ.exterior walls walls'-0" <br /> V LATERAL RESTRAINT PANEL r (unless or 2-2y22 noted onr plan). <br /> 11111111111111111 "4 NTS - _..._ <br /> _. I. Timber Framing <br /> ®_ __ _--- 1 �(X-Cf0-vA� SHEAR WALL AND DIAPHGRAM SCHEDULE _ <br /> o I?YR PLAN 1.All lumber to be graded Per Book No.16 of the West Coast Lumber <br /> O W` L OPENING REINFORCEMENT ATISHEARwAL�L MARK ALLOW MATERIAL EDGE NAILING ANCHOR PLATE REMARKS <br /> B4E�ay LOAD EDGE EDGE' FIELD BOLTS NAILING Inspection Bureau.: per <br /> Not for joists,rafters and light <br /> - MPSON 51110 <br /> BLK'GP <br /> 2-2z STUDS e.r-n- framing,plates,bracing and 4^wide beams.DEC For post and <br /> PER HOLLOW NgL0oueue4 J(gof 180 III v,"COX„ No kWh" 814012" Min.Ad: otter team.I�/DF stud fur 2x4 studs. <br /> (OR EQ.) <br /> PER PIAN - Floor 215 elf ?'."CDX No LUD(1a 10" lOtlHi10' -Ntin.std 2.Comply with a latest edition of the NEPA"National Design <br /> p6R JOISTS PER _ Specification"as modified by the 1BC for all structural timber <br /> FRAMING PLAN _ ono OWl Bd - Min.,I __ "-' _ leakage - m. a Joists an rafters <br /> u 260 elf 'h"CDX Tel (oT6" BtlfaII2' .y`(tn48"16d�16' n std <br /> __.__� AaIN.T SIZE 8:SPADNO hot _-_ -. supports: .. -- . -- <br /> requirements. <br /> aa JJ,��,,, 3. 2 inch lumber be kiln dried• t <br /> Y22' �Iy I6Re(t7 4 d k -W have 2^thick solid blocking a <br /> aux. °" <br /> PER SHEAR WALL scHEo. t,`I re ,,.,g,,, ala "• sv2 1 � all ° ' A35dz� <br /> t2•MIN.EMBEDMENT 'y y ,pye d'swi0°t ma el rename Ma 00 .v.et,®rte ass <br /> ° nwm+rau 1 <br /> A -.-..my h Iu,a the awes <br /> oaccaabe er a'd'amru Wf^2� - t -e .tciii, <br /> �S.-E•. 2-H CONT. requires OM rbwa twi see boa ,` 2 / - <br /> �� 04•ME O.C.w+T. 06.11 Dotty- IR U. Se.DOMee to .➢-•��. A Il'/ M'N' PREFABRICATED FLOOR TRUSSES SHALL BE DESIGNED BY THE MANUFACTURER <br /> ��1� D e vondoxo Dot.WOO MN Da ax '°' n°"' FOR THE SPANS AND CONDITION SHOWN ON THE DRAWINGS AND SHALL BE <br /> �yttI� tT <br /> = z Lai( Ir11=n osi aoa , • <br /> ;en7..M mama ..•,.w++-°�+ ? � 4 "� FURNISHED AND INSTALLED IN CONFORMANCE WITH THE MANUFACTURER'S <br /> • <br /> -'Lu1 AT CORNERS Lt _ ao.s .Ntan t➢ I H <br /> 4 e lZ a� 4•a fiNG PNC �„esourdveadoste (MAI ... <br /> f STANDARDS SET FORTH IN THE ICC REPORT NO.ESP 1774. <br /> I��llrt�llar• ,,,•, , ,,,,,"p r.".. a TRUSSES SHALL BE DESIGNED FOR L/480 DEFLECTION.SUBMIT TRUSS <br /> Il.11=11I11 1111 0 c o :eosa•`'"' ' 2• <br /> C.OMPAGTBD 1:-'30.11=.,-11=1-_ ity --1l 11 '' "" ���'' / FRAMING PLAN TO ARCHITECT AND OWNER PRIOR TO FABRICATION OF THE TRUSSES <br /> PILL2-H CONT. a�I. ,... ..,,,,. i.0 ,.„.; af� ,+ or CLR. .. <br /> [FOUNDATION4511 DETAIL . L 1„.„4, L 4.,„ . <br /> 2� 5 '� n $ j y- F4. GI1EF<Rl(PSG <br /> gym,`, ...,. -__ - _ 4 WA 9320 <br /> x.74 iPvnavrmur,41'e . <br /> 3/< _I D H .sr,; � -' "e 7 //�� u �� box.,4 sna (4 s)2szu]a <br /> 9 <br /> �'iHTI,U . s, muT5 P P X FOR-L S <br /> _ ,� <br /> ,: ,, =D • • D f'` !O T��3, moi= Ad 1s <br /> if ft",;-;.465 <br /> 1 l <br /> Q:Tb ,,. .;'F;"'B t il,, A B c •T, V H .- F - j <br /> / <br /> �s �� 4- SI loll 3�4t 11 of B" SPr(6' t SG IS' #4�IU <br /> 1/ S' /2' 4I-61 (-0"o" 8' -5 s!Z" #5cte''N 408: <br />