My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10531 WASHINGTON WAY 2020-05-21
>
Address Records
>
WASHINGTON WAY
>
10531
>
10531 WASHINGTON WAY 2020-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 9:23:44 AM
Creation date
5/21/2020 9:22:12 AM
Metadata
Fields
Template:
Address Document
Street Name
WASHINGTON WAY
Street Number
10531
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/14/2019 Page <br /> City of Everett <br /> 9:25:16AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1508-005 Site Address 10531 WASHINGTON WY A&B <br /> Applied 8/18/2015 Applicant MCC&S CONST&DEV Lot 3 <br /> Approved 9/25/2015 Owner MCC&S CONST&DEV Block <br /> Issued 10/25/2017 Contractor MCC&S CONST&DEV Tract <br /> Parent Permit No. Description NEW DUPLEX <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Insnector's Comments <br /> 2/24/2017 Letter MEM Warning permit to be Approved permit not picked up-15 days to <br /> cancelled see notes respond-then cancelled. <br /> 3/6/2017 3/20/2017 Permit Extension TKJ <br /> 11/20/2017 11/20/2017 BLDG KMK CORRECTION See notes Not ready.Steel on ground not lapped,etc <br /> FOOTING/SETBAC Need site plan and plans. <br /> 11/21/2017 11/21/2017 BLDG DWF APPROVAL Duplex approved as noted complete verts <br /> FOOTING/SETBAC 18"OC <br /> Footings-as per plans <br /> OK for concrete <br /> Note:Contract installed UFER verified PL <br /> setbacks <br /> 12/20/2017 12/20/2017 BLDG OTHER DWF OTHER Not ready <br /> 1/4/2018 1/4/2018 BLDG KMK APPROVAL <br /> FOUNDATION <br /> 3/16/2018 3/16/2018 BLDG DWF APPROVAL As noted Cleat splice 2"x 10"rim joist <br /> 05-UNDERFLOOR then OK to sheat floor <br /> 5/10/2018 5/10/2018 BLDG KMK APPROVAL <br /> 07-EXTERIOR <br /> 5/16/2018 5/16/2018 GAS 01-ROUGH IN DXW APPROVAL Unit#A 20 PSI, <br /> Unit#B 25 PSI <br /> 5/30/2018 5/30/2018 MECH 04-ROUGH DXW PARTIAL APPR Fireplace exhaust <br /> IN thru wall ok both <br /> unit <br /> 5/30/2018 5/30/2018 PLUMB DXW CORRECTION Change cleanouts in crawl to proper <br /> 03-ROUGH IN cleanouts.Cannot use 2-way cleanout in <br /> horizontal position.Both units-water lines <br /> fount A kitchen move from crawl vent(air <br /> vent)-you do not have to retest. <br /> 6/13/2018 6/13/2018 MECH 04-ROUGH DXW APPROVAL As noted Properly cap chase in Unit B for duct work <br /> IN at top floor ceiling. <br /> At final have combustion air in garage. <br /> 6/13/2018 6/13/2018 PLUMB DXW APPROVAL <br /> 03-ROUGH IN <br /> 6/13/2018 6/13/2018 BLDG DWF PARTIAL APPR Need arch/eng letter for on center spacing <br /> 08-FRAMING for floor truss-M2,G5 <br /> Need positive connection on stair stringers. <br /> Need to post termporary site address to <br /> continue inspections or pay re-inspection <br /> fee.OK <br /> OK to insulate. <br /> 6/20/2018 6/20/2018 BLDG DWF APPROVAL Duplex A and B <br /> 11-INSULATION Insulation ok to cover, <br /> Note:Provide a copy of insulation <br /> certificate and blower door test results at <br /> final. <br /> 6/25/2018 6/25/2018 BLDG DWF PARTIAL APPR Drywall-party walls garage fire protection. <br /> 09-DRYWALL Duplex. <br /> OK to install drywall on celing of garages. <br /> 5'8"type x. <br /> 6/26/2018 6/26/2018 BLDG DWF APPROVAL Drywall nailing OK <br /> 09-DRYWALL to cover <br /> INSP12 CRWsYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.