Laserfiche WebLink
Ef,',L_?; <br /> vE Ark Development <br /> JUL 2 5 2017 Nate Majlesy <br /> 109 2nd st. S. #531 <br /> CITY OF EVERETT Kirkland WA 98033 <br /> Permit Services Tel: 206 227 9654 <br /> Email: 8nosrat@gmail.com <br /> City of Everett,Planning and Community Development Department <br /> July 25, 2017 <br /> Project site address: 3317 Wetmore Ave Everett WA 98201 <br /> Permit No: C1705-017 & C1705-018 <br /> Project Description: Construction of(2)new duplexes <br /> Zone: R-4, Core Residential Overlay <br /> Attention: Jeff Heilman <br /> In response to your letter dated July, 12, 2017 attached please find revised set of <br /> Architectural Plans and structural calculations. 2 sets of 6 sheets for Building 1 and 7 <br /> sheets for building 2 a total of 13 sheets of drawings for each set. <br /> Each item is referred to by the same reference number, as indicated on your original <br /> correspondence; <br /> 1. Bathrooms revised. <br /> 2. Plan revised/note corrected. <br /> 3. Plans revised. Drawings 1-7 & 2-8 indicate energy credits both required and <br /> provided. Water heater efficiency factor indicated on the plans. U factor and R <br /> values table added to drawings 1-6 and 2-7. Note number 1 added to drawings 1- <br /> 7 and 2-8. <br /> 4. Plans revised, note added on section plans. <br /> 5. Mini split provided as instructed. <br /> 6. Plans 1-7 and 2-8 revised accordingly. <br /> 7. Plans revised to show handrail. <br /> 8. Plans revised to show the bollard. <br /> 9. Plans revised to meet the requirement for smoke detectors. <br /> 10. Carbon monoxide alarm provided on each level, accordingly. <br /> 11. Note revised on drawings 1-4 and 2-5. <br /> 12. Framing note revised to correct nailing table. <br /> 13. Beam number 1 is only in building 2 ! Plans revised and beam number 5 added <br /> to note. <br /> 14. Stair framing provided. Please note that the flights of stairs rest on the walls on <br /> both sides. <br /> 15. Detail added on drawings 1-5 and 2-3. <br /> 16. Stairs rest on ledgers and no beam or stringer required. Detail corrected. <br /> 17. Detail revised, beams checked and calculations added/revised. <br /> 18. Detail revised. <br /> 1 <br />